TUPAF064 | Preparation Towards the Ess Linac Ion Source and Lebt Beam Commissioning on Ess Site | 874 |
|
||
Beam commissioning of the proton linac of the European Spallation Source begin in summer, 2018, from the ion source (IS) and low energy beam transport (LEBT), and continues in stages until 2022, when the first beam is sent to its spallation target. This paper presents the plan, status, and highlights of preparation works for the upcoming IS and LEBT beam commissioning. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF064 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPAF065 | Opportunities and Challenges in Planning the Installation, Testing and Commissioning of Large Accelerator Facilities | 878 |
|
||
Delivering major accelerator facilities requires complex project preparation, organisation and scheduling. Often, multiple factors have to be taken into account including technical, financial and political. This makes planning particularly difficult, but at the same time opens opportunities for improving and optimising the project prospects. In this paper, we discuss the major drivers governing the installation, testing and commissioning of major accelerators in general, with particular emphasis on the European Spallation Source (ESS) accelerator, currently under construction in Lund, Sweden. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF065 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPAF087 | The First Experience and Results of Beam Diagnostics Deployment at the ESS Accelerator | 2054 |
|
||
The European Spallation Source (ESS) will produce neutrons for science by subjecting a tungsten target to the high-intensity proton beam from a superconducting linear accelerator. A complete suite of beam diagnostics will enable tuning, monitoring and protection of the accelerator during commissioning, studies and operation. As an initial step toward neutron production, the Ion Source and the 75 keV Low Energy Transport Line is installed on the ESS site in Lund, Sweden. To support the commissioning and characterization of this first beam-producing system, a subset of the full diagnostics suite is deployed. This includes the following equipment: a faraday cup, current transformers, an emittance measurement unit, beam-induced fluorescence monitors, and a doppler-shift spectroscopy system. All aspects of the deployment experience, from acceptance testing through installation, verification, and commissioning will be presented.
*Beam Instrumentation |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPAF087 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |