Paper | Title | Page |
---|---|---|
THPAL067 | Room Temperature Measurements of Higher Order Modes for the SPS Prototype RF-Dipole Crabbing Cavity | 3805 |
|
||
LHC High Luminosity Upgrade will be developing two local crabbing systems to increase the luminosity of the colliding bunches at the ATLAS and CMS experiments. One of the crabbing systems uses the rf-dipole cavity design that will be crabbing the beam in the horizontal plane. The fully integrated crabbing cavity has two higher order mode couplers in damping those excited modes. Currently two sets of HOM couplers have been fabricated at Jefferson Lab for prototyping and testing with the LARP crabbing cavities. This paper presents the measurements of the higher order modes with the prototype HOM couplers carried out at room temperature. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAL067 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPAL137 | Acceptance Testing of the First Group of LCLS II Cryomodules at Jefferson Lab | 3965 |
|
||
Funding: This work was supported by the LCLS-II Project and the US Department of Energy, Contract DE-AC02-76SF00515. The Thomas Jefferson National Accelerator Facility is currently engaged, along with several other Department of Energy (DOE) national laboratories, The Thomas Jefferson National Accelerator Facility is currently engaged, along with several other Department of Energy (DOE) national laboratories, in the Linac Co-herent Light Source II project (LCLS II). The SRF Insti-tute at Jefferson Lab is currently building 17 cryomod-ules for this project. The cryomodules are TESLA style cryomodules that have been modified for continuous wave (CW) operation and for other LCLS II specifica-tions. Each cryomodule contains eight 9-cell cavities with coaxial power couplers operating at 1.3 GHz. The cryomodules also contains a magnet package that con-sists of a quadrupole and two correctors. These cryomod-ules will be tested in the Cryomodule Test Facility (CMTF) at Jefferson Lab before shipment to the Stanford Linear Accelerator (SLAC). Acceptance testing of the LCLS II cryomodules began in December 2016. Seven cryomodules have currently completed Acceptance test-ing. This paper will summarize the results of those tests. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAL137 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPAL141 | Optimizing Procurement Strategies for LCLS-II | 3972 |
|
||
Funding: This work was supported by the LCLS-II Project and the U.S. Department of Energy, Contract DE-AC02-76SF00515 The SLAC National Accelerator Laboratory is currently constructing a major upgrade to its accelerator, the Linac Coherent Light Source II (LCLS-II). Several Department of Energy national laboratories, including the Thomas Jefferson National Accelerator Facility (JLab), are participating in this project. JLab is responsible for procuring a number of critical components. Over the course of this project, JLab has evolved several procurement strategies to minimize risk and improve performance while working within the constraints of budget and schedule. This paper discusses the impact of procurement choices on project technical success. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAL141 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |