Paper | Title | Page |
---|---|---|
TUPML060 | Three-Dimentional Spiral Beam Injection for a Compact Storage Ring | 1673 |
|
||
Funding: This work is supported by JSPS KAKENHI Grant Numbers JP26287055 and JP 23740216. A newly developed three-dimensional spiral injection scheme for beam insertion into a compact (medical MRI size) solenoidal storage ring is introduced. This is a one of key R&D items for a new planned muon g-2/EDM experiment at J-PARC, which aims to measure g-2 to a factor 5 better statistical precision and a factor of 100 better sensitivity for the electric dipole moment measurement (EDM) compared to the previous experiments. The new scheme provides a smooth injection utilizing a radial solenoidal fringe field, without causing any error field in the storage volume. Magnetic pulsed kicker will guide and set the beam in the storage field volume. The strongest point of this new scheme is that any source of the electric field is removed in this scheme to perform ideal EDM measurement. We have performed a test bench experimental work to demonstrate a feasibility of this new injection scheme. Instead of the muon beam, we inject electron beam, from an electron-gun, into the solenoid magnet, and detect three-dimensional spiral beam trajectory inside of the storage chamber by CCD camera. We will discuss outline of a new injection scheme and the latest results from the test bench works. *H. Iinuma et al.,Nuclear Instruments and Methods in Physics Research A, 832, 51-62 (2016) |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPML060 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPML057 | First Commissioning of Vacuum System of Positron Damping Ring for SuperKEKB | 2826 |
|
||
To satisfy the requirements of high beam quality for positron injection into the SuperKEKB main ring, a new damping ring (DR) is constructed in an upgraded injector system. The DR is a racetrack-shaped storage ring with a circumference of 135.5 m, in which the 1.1 GeV positron beam is stored for 40 ms to damp the emittance. The maximum stored beam current is 70.8 mA. Required beam lifetime due to residual gas scattering is longer than 1000 s and the average pressure should be lower than 10-5 Pa. Non-evaporable getter (NEG) pumps are mainly used, and the average effective pumping speed for CO is expected to be 0.013 m3s−1m-1 immediately after NEG activation. The beam pipes are made of aluminum alloy, and have antechambers to deal with synchrotron radiation (critical energy 0.8-0.9 keV, total power 7.2 kW) in arc sections, which are effective in reducing the electron cloud and the impedance of the beam pipes. As additional countermeasures against the electron cloud effect, TiN coating and grooved surfacing are also adopted. The commissioning of the DR will commence at the beginning of 2018. The status of the vacuum system of the DR during the first commissioning will be reported. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML057 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPML058 | Observation of Pressure Bursts in the SuperKEKB Positron Ring | 2830 |
|
||
The SuperKEKB is an electron-positron collider with asymmetric energies in KEK aiming an extremely high luminosity of 8x1035 cm-2 s-1 using a nano-beam scheme. In the Phase 1 commissioning from February to June, 2016, the vacuum system of the main ring worked well as a whole at stored beam currents of approximately 1 A. However, the localized pressure bursts accompanied by beam losses were observed in the positron ring. The beam loss monitors triggered beam aborts, and the phenomena has became an obstacle to the beam commissioning. These pressure bursts were frequently observed from the early stage of the commissioning. Most of the pressure bursts occurred near or inside of aluminum-alloy beam pipes in dipole magnets, which have grooved surface at the top and bottom sides. The various observations indicates that the most probable cause of this phenomenon was the collision between the dusts dropped from the grooves and the circulating positron beam. We report the properties and the probable causes of the pressure bursts, and the possible mitigation methods. Some results of the countermeasures taken prior to the ongoing Phase-2 commissioning will be also presented. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML058 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPML059 | Status of the SuperKEKB Vacuum System in the Phase-2 Commissioning | 2833 |
|
||
The SuperKEKB is an electron-positron collider with asymmetric energies in KEK aiming an extremely high luminosity of 8.0·1035 /cm2/s. In the Phase-1 commissioning from February to June, 2016, the vacuum system of the main ring worked well as a whole at stored beam currents of approximately 1 A. However, several problems were found for the future commissioning, and various countermeasures were taken against these problems during the shutdown period before starting the Phase-2 commissioning. For example, permanent magnets were placed around the beam pipe to suppress the electron cloud effect in the positron ring. Other than these works, new beam pipes for the collision point, the super-conducting final focusing magnets and the positron beam injection region were installed in the main ring. Additional six beam collimators were installed for reducing background noise of the particle detector. Furthermore, the vacuum system for new damping ring for the positron beam was constructed. Reported here will be the present status of the vacuum system of the main ring, and major results of the countermeasures taken prior to the Phase-2 commissioning. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML059 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |