Paper | Title | Page |
---|---|---|
MOPMF006 | Test of Stepwise Electron Bunch Replacement in eRHIC Using an Electron Lens in RHIC | 95 |
|
||
Funding: Work supported by U.S. DOE under contract No DE-AC02-98CH10886 with the U.S. Department of Energy. The electron-ion collider eRHIC requires an electron bunch replacement about every second to maintain both high luminosity and polarization. If the bunch can be replaced in several steps, the requirements for both the electron gun and the electron accelerator are greatly reduced due to the reduced bunch charge. However, a stepwise replacement of electron bunches in eRHIC will give rise to transient effects from the beam-beam interaction that will lead to emittance growth. Such a scheme was tested using one of the RHIC electron lenses with a multiple step increase of the electron current. The test provides an order-of-magnitude estimate of the effect without any further mitigating measures. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-MOPMF006 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPMF025 | LEReC Photocathode DC Gun Beam Test Results | 1306 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. Low Energy RHIC Electron cooler (LEReC) project is presently under commissioning at Brookhaven National Laboratory (BNL). LEReC requires high average current up to 85mA and high-quality electron beam. A 400 kV DC gun equipped with a photocathode and laser system has been chosen to provide a source of high-quality electron beams. We started testing the DC gun during the RHIC run 2017. First electron beam from LEReC DC gun was delivered in April 2017 *. During the DC gun test critical elements of LEReC such as laser beam system, cathode exchange system, cathode QE lifetime, DC gun stability, beam instrumentation, the high-power beam dump system, machine protection system and controls have been tested. Average current of 10 mA for few hours of operation was reached in August 2017. In this paper we present experimental results and experience learned during the LEReC DC gun beam testing. * D. Kayran et al., "First Results of Commissioning DC Photo-gun for RHIC Low Energy Electron Cooler (LEReC)", in Proc of ERL2017. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPMF025 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |