Paper |
Title |
Page |
TUPAF032 |
Beam Transfer Line Design to the SPS Beam Dump Facility |
751 |
|
- Y. Dutheil, J. Bauche, M. Calviani, L.A. Dougherty, M.A. Fraser, B. Goddard, C. Heßler, J. Kurdej, E. Lopez Sola
CERN, Geneva, Switzerland
|
|
|
Studies for the SPS Beam Dump Facility (BDF) are ongoing within the scope of the Physics Beyond Collider project. The BDF is a proposed fixed target facility to be installed in the SPS North Area, to accommodate the SHiP experiment (Search for Hidden Particles), which is most notably aiming at studying hidden sector particles. This experiment requires a high intensity slowly extracted 400 GeV proton beam with 4·1013 protons per 1 s spill to achieve 4·1019 protons on target per year. The extraction and transport scheme will make use of the first 600 m of the existing North Area extraction line. In this paper, we will present the design of the additional 600 m of transfer line towards BDF branching off from the existing line and discuss the detailed design of the BDF beam line, its components and optics. We present the latest results on the study and design of a new laminated Lambertson splitter magnet to provide fast switch between the current North Area experiments and the BDF. The latest specification of a dipole dilution system used to reduce the local peak power of the beam on the target is also presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF032
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPAF033 |
Beam Optics Studies for BDF and for Tests of a Prototype Target |
754 |
|
- C. Heßler, M. Calviani, Y. Dutheil, M.A. Fraser, B. Goddard, V. Kain, E. Lopez Sola, F.M. Velotti
CERN, Geneva, Switzerland
|
|
|
Within the frame of the Physics Beyond Collider project a new fixed target facility at the SPS North Area, the so-called Beam Dump Facility (BDF), is under study. BDF requires a high intensity slowly extracted 400 GeV proton beam with 4·1013 protons per 1 s spill to achieve 4·1019 protons on target per year. This results in an exceptionally high average beam power of 355 kW on the target, which is a major challenge. To validate the target design, a test of a prototype target is planned for 2018 at an existing North Area beam line. A large part of this beam line is in common with the future BDF beam line with comparable beam characteristics and several measurement campaigns were performed in 2017 to study the optics of the line in preparation for the test. The intrinsic characteristics of the slow extraction process make the precise characterisation of the beam reaching the target particularly challenging. This paper presents beam and lattice characterisation methods and associated measurement results.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF033
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPAF052 |
Effects of Electrostatic Septum Alignment on Particle Loss During Slow Extraction at CERN SPS |
826 |
|
- J. Prieto, Y. Dutheil, M.A. Fraser, B. Goddard, V. Kain, L.S. Stoel, F.M. Velotti
CERN, Geneva, Switzerland
- M.A. Kagan
SLAC, Menlo Park, California, USA
|
|
|
Slow extraction is an intrinsically lossy process that splits the beam with an electrostatic septum (ES), employing a thin-wire array to delimit the high electric field region that deflects the beam into the extraction channel. At CERN's Super Proton Synchrotron (SPS) the ES is over 16 m long and composed of 5 separate units containing separate wire-arrays that can be moved independently. The tanks are all mounted on a single support structure that can move the ensemble coherently. As a result, the large number of positional degrees of freedom complicates the alignment procedure in operation. Obtaining and maintaining accurate alignment of the ES with the beam is therefore crucial for minimising beam loss. In this paper, we investigate the alignment procedure for different operational scenarios using particle tracking simulations to understand the beam loss along the extraction straight as a function of the relative positions of each of the 5 separate ES units. An important aspect of the study was to understand the required alignment tolerance to achieve optimum extraction efficiency for a given configuration of wire-array thicknesses.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF052
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|