Paper | Title | Page |
---|---|---|
MOPMF062 | Upgrade of the Dilution System for HL-LHC | 261 |
|
||
The LHC Beam Dump System is one of the most critical systems for reliable and safe operation of the LHC. A dedicated dilution system is required to sweep the beam over the front face of the graphite dump core in order to reduce the deposited energy density. The High Luminosity Large Hadron Collider (HL-LHC) project foresees to increase the total beam intensity in the ring by nearly a factor of two, resulting in a correspondingly higher energy deposition in the dump core. In this paper, the beam sweep pattern and energy deposition for the case of normal dilution as well as for the relevant failure cases are presented. The implications as well as possible mitigations and upgrade measures for the dilution system, such as decreasing the pulse-generator voltage, adding two additional kickers, and implementing a retrigger system, are discussed. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-MOPMF062 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPMF063 | Asynchronous Beam Dump Tests at LHC | 265 |
|
||
The detailed understanding of the beam-loss pattern in case of an asynchronous beam dump is essential for the safe operation of the future High Luminosity LHC (HL-LHC) with nearly twice the nominal LHC beam intensity, leading to correspondingly higher energy deposition on the protection elements. An asynchronous beam dump is provoked when the rise time of the extraction kickers is not synchronized to the 3 us long particle-free abort gap. Thus, particles that are not absorbed by dedicated protection elements can be lost on the machine aperture. Since asynchronous beam dumps are among the most critical failure cases of the LHC, experimental tests at low intensity are performed routinely. This paper reviews recent asynchronous beam dump tests performed in the LHC. It describes the test conditions, discusses the beam-loss behaviour and presents simulation and measurement results. In particular, it examines a test event from May 2016, which led to the quench of four superconducting magnets in the extraction region and which was studied by a dedicated beam experiment in December 2017. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-MOPMF063 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPAF031 | Beam Simulation Studies for the Upgrade of the SPS Beam Dumping System | 747 |
|
||
The SPS at CERN currently uses a beam dumping system that is installed in the long straight section 1 (LSS1) of the SPS. This system consists of two beam stopper blocks for low and high energy beams, as well as two vertical and three horizontal kicker magnets, which deflect and dilute the beam on the dumps. Within the frame of the LHC injector upgrade project (LIU) the beam dumping system will be relocated to long straight section 5 (LSS5) and upgraded with an additional vertical kicker, new main switches and a single new beam dump, which covers the full energy range. The impact of a possible increase of the vertical kicker rise time on the beam has been studied in simulations with MAD-X for the different optics in the SPS. Furthermore, the impact on the beam in failure scenarios such as the non-firing of one kicker has been investigated. The results of these studies will be presented and discussed in this paper. Operational mitigation methods to deal with an increased rise time will also be discussed. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF031 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPAF058 | Optimization of the FCC-hh Beam Extraction System Regarding Failure Avoidance and Mitigation | 850 |
|
||
A core part of the Future Circular Collider (FCC) study is a high energy hadron-hadron collider with a circumference of nearly 100~km and a center of mass beam energy of 100~TeV. The energy stored in one beam at top energy is 8.3~GJ, more than 20 times that of the LHC beams. Due to the large damage potential of the FCC-hh beam, the design of the beam extraction system is dominated by machine protection considerations and the requirement of avoiding any material damage in case of an asynchronous beam dump. Erratic operation of one or more extraction kickers is a main contributor to asynchronous beam dumps. The presented study shows ways to reduce the probability and mitigate the impact of erratic kicker switching. Key proposals to achieve this include layout considerations, different hardware options and alternative reaction strategies in case of erratic extraction kicker occurrence. Based on these concepts, different solutions are evaluated and an optimized design for the FCC-hh extraction system is proposed. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF058 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPAF060 | Injection and Dump Systems for a 13.5 TeV Hadron Synchrotron HE-LHC | 858 |
|
||
One option for a future circular collider at CERN is to build a 13.5 TeV hadron synchrotron, or High Energy LHC (HE-LHC) in the LHC tunnel. Injection and dump systems will have to be upgraded to cope with the higher beam rigidity and increased damage potential of the beam. The required modifications of the beam transfer hardware are highlighted in view of technology advancements in the field of kicker switch technology. An optimised straight section optics is shown. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF060 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPMF075 | Performance Measurements and Analysis of Jitter Like Events for the PS Injection Kicker System | 2549 |
|
||
In the framework of the LIU project, several modifications have been made to the CERN PS injection kicker system during the winter stop 2016-2017 (EYETS). Current waveform and beam-based measurements were carried out in 2017 to validate the implemented design changes by observing the magnetic field impact on the beam. During these long-term measurements, increased values for the rise and fall times were observed when compared to single shot observations of the current waveform. An unknown source of jitter-like pre-firing in the main switch has been identified, creating an additional challenge to meet the already tight system rise and fall time specifications. This paper briefly describes the efforts made to fine tune the pulse generator after the EYETS, summarises the optimised configuration and analyses the observed jitter events. A new triggering system design is briefly outlined to address the issue. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMF075 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPMF086 | Eradication of Mercury Ignitron from the 400 kA Magnetic Horn Pulse Generator for CERN Antiproton Decelerator | 2586 |
|
||
The CERN Antiproton Decelerator (AD) produces low-energy antiprotons for studies of antimatter. A 26 GeV proton beam impacts the AD production target which produces secondary particles including antiprotons. A magnetic Horn (AD-Horn) in the AD target area is used to focus the diverging antiproton beam and increase the antiproton yield enormously. The horn is pulsed with a current of 400 kA, generated by capacitor discharge type generators equipped with ignitrons. These mercury-filled devices present a serious danger of environmental pollution in case of accident and safety constraints. An alternative has been developed using solid-state switches and diodes. Similar technology was already implemented at CERN for ignitron eradication in the SPS Horizontal beam dump in the early 2000s. A project was launched to design and set up a full-scale test-bench, to install and test a dedicated solid-state solution. Following the positive results obtained from the test-bench, the replacement of ignitrons by solid-state devices in the operational AD-Horn facility is currently under preparation. This paper describes the test-bench design and results obtained for this very high current pulser. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMF086 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPMK001 | Preliminary Design of a Cooling System for the LHC Injection Kicker Magnets | 2624 |
SUSPL086 | use link to see paper's listing under its alternate paper code | |
|
||
The CERN Large Hadron Collider (LHC) is equipped with two fast pulsed magnet systems (MKIs) that inject particle beams from the injector chain. Future operation for High Luminosity LHC (HL-LHC) with high intensity beams will cause heating of the ferrite yokes of the MKIs beyond their Curie temperature, preventing injection until the yokes cool down. Beam coupling impedance studies show that it is possible to move a substantial portion of the beam induced power deposition from the upstream ferrite yokes, which are the yokes with the highest power deposition, to ferrite rings located at the upstream end of the magnet. Thermal predictions show that this power redistribution, combined with the installation of a cooling system around the rings, will maintain the temperatures of all the yokes and ferrite rings below their Curie point. Since the rings are not pulsed to high voltage, whereas the ferrite yokes are, the installation of a cooling system is feasible around the rings. The proposed design of the cooling system will be tested to ensure good performance before its installation on the MKIs. The details of the simulations and the design process are reported. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMK001 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPMK003 | An Upgraded LHC Injection Kicker Magnet | 2632 |
|
||
Funding: Work supported by the HL-LHC project. An upgrade of the LHC injection kickers is necessary for HL-LHC to avoid excessive beam induced heating of these magnets: the intensity of the HL-LHC beam will be twice that of LHC. In addition, in the event that it is necessary to exchange an injection kicker magnet, the newly installed kicker magnet would limit HL-LHC operation for a few hundred hours due to dynamic vacuum activity. Extensive studies have been carried out to identify practical solutions to these problems: these include redistributing a significant portion of the beam induced power deposition to ferrite parts of the kicker magnet which are not at pulsed high voltage and water cooling of these parts. Furthermore a surface coating, to mitigate dynamic vacuum activity, has been selected. The results of these studies, except for water cooling, have been implemented on an upgraded LHC injection kicker magnet: this magnet was installed in the LHC during the 2017-18 Year End Technical Stop. This paper presents the upgrades, including some test and measurement results. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMK003 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |