Author: Collamati, F.
Paper Title Page
MOPMF085 Beam-gas Background Characterization in the FCC-ee IR 322
 
  • M. Boscolo, O.R. Blanco-García
    INFN/LNF, Frascati (Roma), Italy
  • H. Burkhardt, R. Kersevan, M. Lueckhof
    CERN, Geneva, Switzerland
  • F. Collamati
    INFN-Roma1, Rome, Italy
 
  The MDISim toolkit is used to evaluate and characterize the beam-gas induced background in the FCC-ee Interaction Region. MDISim allows a full characterization of this beam background source with the locations where the beam-gas scattering occurs as well as the loss points, as a function of different vacuum conditions and composition, for the nominal optics and parameters. Detailed pressure distribution profiles have been obtained running coupled synchrotron radiation and molecular flow montecarlo codes, as an input to the GEANT4 calculations. The particles hitting the pipe in the IR can be tracked in the detectors with a full Geant-4 simulation. Semi-analytic estimates for the expected rates and lifetime are also performed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-MOPMF085  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPMF086 Proposal of an Experimental Test at DAΦNE for the Low Emittance Muon Beam Production From Positrons on Target 326
 
  • M. Boscolo, M. Antonelli, O.R. Blanco-García, S. Guiducci, A. Stella
    INFN/LNF, Frascati (Roma), Italy
  • F. Collamati
    INFN-Roma1, Rome, Italy
  • R. Li Voti
    Sapienza University of Rome, Rome, Italy
  • S.M. Liuzzo, P. Raimondi
    ESRF, Grenoble, France
 
  We present in this paper the proposal of an experimental test at DAΦNE of the positron-ring-plus-target scheme foreseen in the Low EMittance Muon Accelerator. This test would be a validation of the on-going studies for LEMMA and it would be synergic with other proposals at DAΦNE after the SIDDHARTA run. We discuss the beam dynamics studies for different targets inserted in a proper location through the ring, i.e. where the beam is focused and dispersion-free. Optimization of beam parameters, thickness and material of target and optics of the target insertion are shown as well. The development of the existent diagnostic needed to test the behavior of the circulating beam is described together with the turn-by-turn measurement systems of charge, lifetime and transverse size. Measurements on the temperature and thermo-mechanical stress on the target are also under study.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-MOPMF086  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPMF087 Muon Accumulator Ring Requirements for a Low Emittance Muon Collider from Positrons on Target 330
 
  • M. Boscolo, M. Antonelli, O.R. Blanco-García, S. Guiducci
    INFN/LNF, Frascati (Roma), Italy
  • F. Collamati
    INFN-Roma1, Rome, Italy
  • L. Keller
    SLAC, Menlo Park, California, USA
  • S.M. Liuzzo, P. Raimondi
    ESRF, Grenoble, France
  • D. Schulte
    CERN, Geneva, Switzerland
 
  Very low emittance muon beams can be produced by direct annihilation of about 45~GeV positrons on atomic electrons in a thin target. With such a muon beam source, a mu+mu- collider can be designed in the multi-TeV range at very high luminosities. In this scheme two muon accumulator rings are foreseen to recollect the muon bunches that will be injected in the collider. We present in this paper the first consideration of the muon accumulator rings. Realistic muon beam emittance and energy spread coming from the muon target are described. Constraints on the accumulator ring requirements are derived.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-MOPMF087  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)