Author: Briz Monago, J.A.
Paper Title Page
TUPAF025 Multi-turn Study in FLUKA for the Design of CERN-PS Internal Beam Dumps 724
 
  • J.A. Briz Monago, M. Calviani, F. Cerutti, J.J. Esala, S.S. Gilardoni, F.-X. Nuiry, G. Romagnoli, G. Sterbini, V. Vlachoudis
    CERN, Geneva, Switzerland
 
  The CERN Proton-Synchrotron (PS) accelerator is currently equipped with two internal beam dumps in operation since the 1970's. An upgrade is required to be able to withstand the beams that will be produced after the end of the LIU (LHC Injector Upgrade) project. For the design of the new dumps, the interaction and transport of beam and all secondary particles generated has been simulated using FLUKA. The working principle of the internal beam dump in the PS ring is very peculiar with respect to the other dumps in the CERN accelerator complex. A moving dump intercepts the circulating beam during few milliseconds like a fast scraper. The moving dump shaving the beam, the multi-turn transport of beam particles in the PS accelerator and a time-dependent energy deposition in the dump were modeled. The methodology and the results obtained in our studies for the dump core and downstream equipment will be reported in this contribution.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF025  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF047 Systematic Studies of Transverse Emittance Measurements Along the CERN PS Booster Cycle 806
 
  • A. Santamaría García, S.C.P. Albright, H. Bartosik, J.A. Briz Monago, G.P. Di Giovanni, V. Forte, B. Mikulec, F. Roncarolo, V. Vlachoudis
    CERN, Geneva, Switzerland
 
  The CERN Proton Synchrotron Booster (PSB) will need to deliver 2 times the current brightness to the Large Hadron Collider (LHC) after the LHC Injectors Upgrade (LIU) to meet the High-Luminosity-LHC beam requirements. Beam intensity and transverse emittance are the key parameters to increase brightness, the latter being more difficult to manipulate. It is, therefore, crucial to monitor not only the emittance evolution between the different injectors but also along each acceleration cycle. To this end, detailed emittance measurements were carried out for the four rings of the PSB at various times in the cycle with different beam types. A thorough analysis of systematic error sources was conducted including multiple Coulomb scattering happening during profile measurements with wire scanners, where experimental and analytical treatments of the emittance blow-up were compared to FLUKA simulations. In order to properly account for the dispersive contribution, the full momentum spread profile was considered using a deconvolution method. We conclude with an assessment of this first comprehensive emittance evolution measurement along the PSB cycle.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF047  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMG001 Engineering Design and Prototyping of the New LIU PS Internal Beam Dumps 2600
 
  • G. Romagnoli, J.A. Briz Monago, M.E.J. Butcher, M. Calviani, D.G. Cotte, Y. C. Coutron, J.J. Esala, E. Grenier-Boley, J. Hansen, A. Huschauer, A. Masi, F.-X. Nuiry, D. Steyart, V. Vlachoudis
    CERN, Geneva, Switzerland
 
  For the LHC Injectors Upgrade (LIU) at CERN, the two Proton Synchrotron (PS) internal dumps are redesigned and upgraded for the new high intensity/brightness beams. The dumps are installed as active elements in the lattice in straight sections between the main bending magnets. The dumps are moved into the beam when requested by operation and shave the circulating beam turn by turn stopping the beam after about 6 ms. The shaving induces a very localized beam energy deposition on the dump surface in a thickness of tens of microns. A completely new approach has been developed with FLUKA to simulate beam shaving, coupled with ANSYS to define a new dump core design. This paper presents the design of the dump based on operational constraints such as cycling 200 000 times per year for 20 years, limited access for maintenance or reaching the beam trajectory in 150 ms. These constraints had a major impact on the technological choices. The new dump core is made of a low-density graphite block followed by a denser copper alloy (CuCr1Zr) one. Water circuits, bonded with Hot Isostatic Pressing, are cooling the core in ultra-high vacuum. The core is moved by a spring-based actuation mechanism.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMG001  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMG004 Design of the Future High Energy Beam Dump for the CERN SPS 2612
 
  • S. Pianese, J.A. Briz Monago, M. Calviani, D. Grenier, P.B. Heckmann, J. Humbert, R. Illan Fiastre, A. Perillo-Marcone, G. Romagnoli, S. Sgobba, D. Steyart, V. Vlachoudis
    CERN, Geneva, Switzerland
 
  The future CERN Super Proton Synchrotron (SPS) internal dump (Target Internal Dump Vertical Graphite, known as TIDVG#5), to be installed during CERN's Long Shutdown 2 (2019-2020), will be required to intercept beam dumps from 26 to 450 GeV, with increased intensity and repetition rates with respect to its predecessor (TIDVG#4). The beam power to be managed by the dump will increase by approximately a factor of four; resulting in new challenges in terms of design in order to fulfil the highly demanding specification, which is based on guaranteeing a good performance of the machine with little or no limitations imposed by this device. This paper presents the proposed design, including material selection, manufacturing techniques and thermo-mechanical simulations under different operational scenarios expected during the lifetime of the device.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMG004  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPAK091 Design of the New Proton Synchrotron Booster Absorber Scraper (PSBAS) in the Framework of the Large Hadron Collider Injection Upgrade (LIU) Project 3444
 
  • L. Teofili, M. Migliorati
    Sapienza University of Rome, Rome, Italy
  • J.A. Briz Monago, M. Calviani, N. Chritin, J.J. Esala, S.S. Gilardoni, I. Lamas Garcia, J. Maestre, T. Polzin, T.L. Rijoff
    CERN, Geneva, Switzerland
  • T.L. Rijoff
    TU Darmstadt, Darmstadt, Germany
 
  The Large Hadron Collider (LHC) Injector Upgrade (LIU)Project at CERN calls for increasing beam intensity for the LHC accelerator chain. Some machine components will not survive the new beam characteristics and need to be rebuilt for the new challenging scenario. This is particularly true for beam intercepting devices (BIDs) such as dumps, collimators, and absorber/scrapers, which are directly exposed to beam impacts. In this context, this work summarizes conceptual design studies on the new Proton Synchrotron Booster (PSB) Absorber/Scraper (PSBAS), a device aimed at cleaning the beam halo at the very early stage of the PSB acceleration. This paper outlines the steps performed to fulfil the component design requirements. It discusses thermo-mechanical effects as a consequence of the beam-matter collisions, simulated with the FLUKA Monte Carlo code and ANSYS finite element software; and the impedance minimization study performed to prevent beam instabilities and to reduce RF-heating on the device.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAK091  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)