Paper | Title | Page |
---|---|---|
THPAK019 | Beam Dynamics of the First Beams for IFMIF-EVEDA RFQ Commissioning | 3246 |
|
||
The installation of the IFMIF-EVEDA RFQ, MEBT, LEBT, source and beam dump was completed in September 2017. The beam dynamics of the first beams for the IFMIF-EVEDA RFQ commissioning is presented. Moreover, a proposal for the CW RFQ steady state commissioning is shown, with a focus on the beam dynamics challenges of the beam transport after the RFQ. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAK019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPAF016 | Increase of IPHI Beam Power at CEA Saclay | 694 |
|
||
For the first time, in April 2016, the SILHI source produced a proton beam for IPHI RFQ. Due to several technical difficulties on the RFQ water cooling skid, a short RF power pulse (100 μs at the beginning until few hundred microseconds) is injected into the RFQ accelerates the high intensity proton beam up to 3 MeV. The repetition rate is tuned between 1 and 5 Hz. Under these conditions, the beam power after the RFQ is lower than 100 W. At the end of 2017, the 352 MHz RFQ conditioning has been completed (with the same duty cycle) and the proton beam has been accelerated. The increase of the beam power is expected to continue in 2018 in order to reach several kilowatts by the end of the year. In addition, two Ionization beam Profile Monitors (IPM) developed for ESS have been tested on the deviated beam line with a very low duty cycle. The IPHI facility should demonstrate the possibility to produce neutrons with a flexible compact accelerator in the framework of the SONATE project. This paper presents the status of the IPHI project in April 2018. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF016 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPAF026 | Beam Induced Fluorescence Measurements of 100 keV Deuterons in LIPAc Accelerator | 1877 |
SUSPL052 | use link to see paper's listing under its alternate paper code | |
|
||
Funding: Work partially supported by the Spanish Ministry of Science and Innovation under project FIS2013-40860-R The LIPAc accelerator will be a linear CW deuteron accelerator capable of delivering a 9 MeV, 125 mA beam which aims to validate the technology that will be used in the future high power accelerator-driven neutron source, IFMIF. In summer 2017 a campaign of measurements was done during the injector commissioning, in which a Fluorescence Profile Monitor based on an Intensified CID camera (ICID) was used to measure the beam transverse profile at the extraction of the ion source. In this contribution we review the design of the ICID, its performance and discuss the measurements carried out. The performance of ICID monitors for its use in future accelerators will be assessed. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPAF026 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THXGBF2 | Beam Commissioning of the IFMIF EVEDA Very High Power RFQ | 2902 |
|
||
IFMIF, the International Fusion Materials Irradiation Facility, is an accelerator-based neutron source that will use Li(d, xn) reactions to generate a flux of neutrons with a broad peak at 14 MeV equivalent to the conditions of the Deuterium-Tritium reactions in a fusion power plant. IFMIF is conceived for fusion materials testing. The IFMIF prototype linear accelerator (LIPAc) is jointly developed by Europe and Japan within the IFMIF EVEDA project: it is composed of an ion source, a LEBT, an RFQ, a MEBT and a SC linac, with a final energy of 9 MeV. The 4-vane Radio Frequency Quadrupole (RFQ), developed by INFN in Italy, will accelerate a 130 mA deuteron beam from 0.1 to 5 MeV in continuous wave, for a beam power of 650 kW. The 9.8 m long 175 MHz cavity is composed of 18 x 0.54 m long modules flanged together and aligned within 0.3 mm tolerance. The RFQ was completed, delivered and assembled at the Rokkasho site and is presently under extended RF tests. The second phase of beam commissioning (up to 2.5 MeV/u) was scheduled to start at the end of 2017. Several unexpected issues and incidents significantly delayed the original program, which is however proceeding step by step toward the full achievement of its goals. | ||
![]() |
Slides THXGBF2 [5.318 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THXGBF2 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |