Paper |
Title |
Page |
WEPAL040 |
High Precision Synchronization Development for HiRES, the Ultrafast Electron Diffraction Beamline at LBNL |
2262 |
|
- Y. Yang, K.M. Baptiste, M. Betz, L.R. Doolittle, Q. Du, D. Filippetto, G. Huang, F. Ji
LBNL, Berkeley, California, USA
|
|
|
Precise synchronization between the laser and electron is critical for the pump-probe experiments in the HiRES Ultrafast Electron Diffraction facility. We are upgrading the LLRF and laser control system, which ultimately aims at a synchronization below 50 fs RMS between the pump laser pulse and electron probe at the sample plane. Such target poses tight requirements on the RF field stability both in amplitude and phase, and on the synchronization between the RF field and the laser repetition rate. We are presently developing a new LLRF system that has the potential to decrease the overall noise, reaching the required stability of tens of ppm on RF amplitude and phase. For the laser control side, we are replacing the long coaxial cables with fibers for both control signal transmission and laser signal reception. The control transmission side has been implemented, and the timing jitter has been reduced.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-WEPAL040
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|