THPMF034 Status Report of the Berlin Energy Recovery Linac Project BERLinPro 4127
 
  • M. Abo-Bakr, W. Anders, Y. Bergmann, K.B. Bürkmann-Gehrlein, A.B. Büchel, P. Echevarria, A. Frahm, H.-W. Glock, F. Glöckner, F. Göbel, B.D.S. Hall, S. Heling, H.-G. Hoberg, A. Jankowiak, C. Kalus, T. Kamps, G. Klemz, J. Knobloch, J. Kolbe, G. Kourkafas, J. Kühn, B.C. Kuske, J. Kuszynski, A.N. Matveenko, M. McAteer, A. Meseck, R. Müller, A. Neumann, N. Ohm, K. Ott, E. Panofski, F. Pflocksch, L. Pichl, J. Rahn, M.A.H. Schmeißer, O. Schüler, M. Schuster, J. Ullrich, A. Ushakov, J. Völker
    HZB, Berlin, Germany
  • A. Bundels
    Helmholtz-Zentrum Berlin für Materialien und Energie GmbH (HZB), Berlin, Germany
 
  Funding: Work supported by the German Bundesministerium für Bildung und Forschung, Land Berlin and grants of Helmholtz Association
The Helmholtz-Zentrum Berlin is constructing the Energy Recovery Linac Prototype BERLinPro, a demonstration facility for the science and technology of ERLs for future light source applications. BERLinPro is designed to accelerate a high current (100 mA, 50 MeV), high brilliance (norm. emittance below 1 mm mrad) cw electron beam. We report on the last year's progress, including the comissioning of the gun module as the first SRF component to be installed in BERLinPro.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPMF034  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPMF038 Status of the BESSY VSR Project 4138
 
  • P. Schnizer, W. Anders, Y. Bergmann, P. Goslawski, H. Hartmut, A. Jankowiak, J. Knobloch, A. Neumann, K. Ott, M. Ries, A. Schälicke, A.V. Vélez
    HZB, Berlin, Germany
 
  BESSY VSR is set out to provide a variable pulse pattern to the BESSY II users. This project is now fully funded and heading into its implementation phase. The pulse pattern, consisting of long and short pulses, require inserting cavities providing a 3rd and a 3.5th harmonic of the fundamental harmonic of the ring. Therefore 1.5 and 1.75 GHz cavities are developed with appropriate higher order mode damping spectrum. Similarly the BESSY II ring and injector chain has to be upgraded to provide appropriate diagnostics and increase the injection efficiency. In this paper we give the current status of the project and give an overview of scientific challenges currently being tackled.  