  The Large Hadron Collider (LHC) has been delivering data to the physics experiments since 2009. It first operated at a centre of mass energy of 7 TeV and 8 TeV up to the first long shutdown (LS1) in 2013-14. The 13 kA splices between the main LHC cryomagnets were consolidated during LS1. Then, it was possible to increase safely the centre of mass energy to 13 TeV. During the training campaigns, metallic debris caused short circuits in the dipole diode containers, leading to an unacceptable risk. Major interventions can only take place during multiyear shutdowns. To ensure safe operation at higher energies, hence requiring further magnets training, the electrical insulation of the 1232 dipole diodes bus-bars will be consolidated during the second LHC long shutdown (LS2) in 2019-20. The design of the reinforced electrical insulation of the dipole cold diodes and the associated project organisation are presented, including the validation tests, especially at cryogenics temperature. During LS2, maintenance interventions on the LHC cryomagnets will also be performed, following the plan based on a statistical analysis of the electrical faults. It is inscribed in the overall strategy to produce collisions at 14 TeV, the LHC design energy, and to push it further towards 15 TeV. We give a first guess on the impact on the LHC failure rate.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-MOPMF056  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF028 Energy Deposition Studies and Analysis of the Quench Behavior in the Case of Asynchronous Dumps During 6.5 TeV LHC Proton Beam Operation 736
 
  • M.I. Frankl, W. Bartmann, M. Bednarek, C. Bracco, A. Lechner, A.P. Verweij, C. Wiesner, D. Wollmann
    CERN, Geneva, Switzerland
 
  The CERN LHC beam dumping system comprises a series of septa and fast-pulsed kicker magnets for extracting the stored proton beams to the external beam dumps. Different absorbers in the extraction region protect superconducting magnets and other machine elements in case of abnormal beam aborts, where bunches are swept across the machine aperture. During Run 2 of the LHC, controlled beam loss experiments were carried out at 6.5 TeV probing the particle leakage from protection devices under realistic operation conditions. This paper presents particle shower simulations analyzing the energy deposition in superconducting coils and assessing if the observed magnet quenches are compatible with the presently known quench limits.  