Author: Barnes, M.J.
Paper Title Page
TUPAF058 Optimization of the FCC-hh Beam Extraction System Regarding Failure Avoidance and Mitigation 850
 
  • E. Renner, M.J. Barnes, W. Bartmann, F. Burkart, E. Carlier, L. Ducimetière, B. Goddard, T. Kramer, A. Lechner, N. Magnin, V. Senaj, J.A. Uythoven, P. Van Trappen, C. Wiesner
    CERN, Geneva, Switzerland
 
  A core part of the Future Circular Collider (FCC) study is a high energy hadron-hadron collider with a circumference of nearly 100~km and a center of mass beam energy of 100~TeV. The energy stored in one beam at top energy is 8.3~GJ, more than 20 times that of the LHC beams. Due to the large damage potential of the FCC-hh beam, the design of the beam extraction system is dominated by machine protection considerations and the requirement of avoiding any material damage in case of an asynchronous beam dump. Erratic operation of one or more extraction kickers is a main contributor to asynchronous beam dumps. The presented study shows ways to reduce the probability and mitigate the impact of erratic kicker switching. Key proposals to achieve this include layout considerations, different hardware options and alternative reaction strategies in case of erratic extraction kicker occurrence. Based on these concepts, different solutions are evaluated and an optimized design for the FCC-hh extraction system is proposed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF058  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF059 Design and Evaluation of FCC-hh Injection Protection Schemes 854
 
  • E. Renner, M.J. Barnes, W. Bartmann, C. Bracco, R. Bruce, F. Burkart, B. Goddard, A. Lechner, L.S. Stoel, F.M. Velotti, C. Wiesner, D. Woog
    CERN, Geneva, Switzerland
 
  The Future Circular Collider (FCC) study considers several injector scenarios for FCC-hh, the proposed 100~TeV centre of mass hadron collider located at CERN. The investigated options include amongst others to use the LHC at 3.3~TeV or a superconducting SPS at 1.3~TeV as a High Energy Booster (HEB). Due to the high energy of the injected proton beam and the short time constant of injection failures, a thorough consideration of potential failure cases is of major importance. Further attention has to be given to the fact that the injection is - as in LHC - located upstream of the side experiments. Failure scenarios are identified for both injector options, appropriate designs of injection protection schemes are proposed and first simulations are conducted to validate the protection efficiency.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF059  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF060 Injection and Dump Systems for a 13.5 TeV Hadron Synchrotron HE-LHC 858
 
  • W. Bartmann, M.J. Barnes, L. Ducimetière, B. Goddard, M. Hofer, T. Kramer, A. Lechner, E. Renner, A. Sanz Ull, V. Senaj, L.S. Stoel, C. Wiesner
    CERN, Geneva, Switzerland
 
  One option for a future circular collider at CERN is to build a 13.5 TeV hadron synchrotron, or High Energy LHC (HE-LHC) in the LHC tunnel. Injection and dump systems will have to be upgraded to cope with the higher beam rigidity and increased damage potential of the beam. The required modifications of the beam transfer hardware are highlighted in view of technology advancements in the field of kicker switch technology. An optimised straight section optics is shown.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF060  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMF076 First Prototype Inductive Adder for the FCC Injection 2553
 
  • D. Woog, M.J. Barnes, A. Ferrero Colomo, J. Holma, T. Kramer
    CERN, Geneva, Switzerland
 
  A highly reliable kicker system is required as part of the injection for the FCC. A significant weak point of conventional kicker systems is often the pulse generator, where a Pulse Forming Network/Line (PFN/PFL) is discharged through a thyratron switch to generate the current pulse for the kicker magnet. This design has several disadvantages: in particular the occasional erratic turn-on of the switch which cannot be accepted for the FCC. A potential replacement is the inductive adder (IA) that uses semiconductor switches and distributed capacitors as energy storage. The modular design, low maintenance and high flexibility make the IA a very interesting alternative. In addition, the ability to both turn-on and off the current also permits the replacement of PFN/PFL by the capacitors. A first FCC prototype IA, capable of generating 9 kV and 2.4 kA pulses, has been designed and built at CERN. It will be upgrade to a full-scale prototype (15 kV, 2.4 kA) in 2018. This paper presents measurement results from the 9 kV prototype and outlines the conceptual changes and expected performance of the 15 kV prototype.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMF076  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMF077 Demonstration of Feasibility of the CLIC Damping Ring Extraction Kicker Modulators 2557
 
  • J. Holma, M.J. Barnes, A. Ferrero Colomo
    CERN, Geneva, Switzerland
 
  The CLIC study is investigating the technical feasibility of an electron-positron collider with high luminosity and a nominal centre-of-mass energy of 3 TeV. Pre-damping rings and damping rings (DRs) will produce ultra-low emittance beam with high bunch charge. The DR kicker systems must provide extremely stable field pulses to avoid beam emittance increase. The DR extraction kicker system consists of a stripline kicker and two pulse modulators. Specifications for the electromagnetic field pulses require that the modulator produce pulses of 160 or 900 ns flattop duration, ±12.5 kV and 305 A, with ripple and droop of not more than ±0.02 % (±2.5 V) with respect to an ideal waveform. Inductive adder topology has been chosen for the pulse modulators where the output waveform can be adjusted by applying analogue modulation methods. Two full-scale, 20-layer, 12.5 kV prototype inductive adders have been designed and built, and they are being tested at CERN. These modulators will be tested with a prototype stripline kicker, installed in a beamline at ALBA Synchrotron Light Source in Spain. The results of the laboratory tests and measurements are presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMF077  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMF089 Measurements of Electromagnetic Properties of Ferrites as a Function of Frequency and Temperature 2592
 
  • A. Chmielinska, M.J. Barnes, F. Caspers, B.K. Popovic, C. Vollinger
    CERN, Geneva, Switzerland
 
  Fast kicker magnets are used to inject beam into and extract beam out of the CERN accelerator rings. These kickers are often ferrite loaded transmission line type magnets with a rectangular shaped aperture through which the beam passes. The interaction of the beam with the resistive part of the longitudinal beam coupling impedance leads to power dissipation and heating of different elements in the accelerator ring. In particular, power deposition in the kicker magnets can be a limitation: if the temperature of the ferrite yoke exceeds the Curie temperature, the beam will not be properly deflected. In addition, the imaginary portion of the beam coupling impedance contributes to beam instabilities. A good knowledge of electromagnetic properties of materials up to GHz frequency range is essential for a correct impedance evaluation. This paper presents the results of transmission line measurements of complex initial permeability and permittivity for different ferrite types. We present an approach for deriving electromagnetic properties as a function of both frequency and temperature; this information is required for simulating ferrite behaviour under realistic operating conditions.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMF089  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMK001 Preliminary Design of a Cooling System for the LHC Injection Kicker Magnets 2624
SUSPL086   use link to see paper's listing under its alternate paper code  
 
  • L. Vega Cid, M.J. Barnes, L. Ducimetière, M.T. Moester, V. Vlachodimitropoulos, W.J.M. Weterings
    CERN, Geneva, Switzerland
  • A. Abánades
    ETSII UPM, Madrid, Spain
 
  The CERN Large Hadron Collider (LHC) is equipped with two fast pulsed magnet systems (MKIs) that inject particle beams from the injector chain. Future operation for High Luminosity LHC (HL-LHC) with high intensity beams will cause heating of the ferrite yokes of the MKIs beyond their Curie temperature, preventing injection until the yokes cool down. Beam coupling impedance studies show that it is possible to move a substantial portion of the beam induced power deposition from the upstream ferrite yokes, which are the yokes with the highest power deposition, to ferrite rings located at the upstream end of the magnet. Thermal predictions show that this power redistribution, combined with the installation of a cooling system around the rings, will maintain the temperatures of all the yokes and ferrite rings below their Curie point. Since the rings are not pulsed to high voltage, whereas the ferrite yokes are, the installation of a cooling system is feasible around the rings. The proposed design of the cooling system will be tested to ensure good performance before its installation on the MKIs. The details of the simulations and the design process are reported.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMK001  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMK002 Longitudinal Impedance Analysis of an Upgraded LHC Injection Kicker Magnet 2628
 
  • V. Vlachodimitropoulos, M.J. Barnes, L. Vega Cid, W.J.M. Weterings
    CERN, Geneva, Switzerland
 
  Prior to Long Shutdown 1 (LS1) one of the LHC injection kickers (MKIs) occasionally exhibited high temperatures leading to significant turnaround times. After a successful impedance mitigation campaign during LS1, the MKI ferrite yokes have remained below their Curie point and have not limited LHC's availability. However, for HL-LHC operation the MKI yokes are expected to exceed their Curie temperatures after long physics runs. To ensure uninterrupted future HL-LHC operation, a modified beam screen design, relocating some of the heat load to more easily cooled parts, and a suitable cooling system are under development as the current baseline for the HL-LHC upgrade of the MKIs. An upgraded beam screen providing such relocation has been designed, simulated and compared to the existing model. To validate simulations, two longitudinal beam coupling impedance measurement techniques have been used and the results are compared to predictions. The modified beam screen was implemented in an upgraded MKI installed in the LHC during the Year End Technical Stop (YETS) 2017/18.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMK002  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMK003 An Upgraded LHC Injection Kicker Magnet 2632
 
  • M.J. Barnes, C. Bracco, G. Bregliozzi, A. Chmielinska, L. Ducimetière, B. Goddard, T. Kramer, H. Neupert, L. Vega Cid, V. Vlachodimitropoulos, W.J.M. Weterings, C. Yin Vallgren
    CERN, Geneva, Switzerland
  • A. Chmielinska
    EPFL, Lausanne, Switzerland
 
  Funding: Work supported by the HL-LHC project.
An upgrade of the LHC injection kickers is necessary for HL-LHC to avoid excessive beam induced heating of these magnets: the intensity of the HL-LHC beam will be twice that of LHC. In addition, in the event that it is necessary to exchange an injection kicker magnet, the newly installed kicker magnet would limit HL-LHC operation for a few hundred hours due to dynamic vacuum activity. Extensive studies have been carried out to identify practical solutions to these problems: these include redistributing a significant portion of the beam induced power deposition to ferrite parts of the kicker magnet which are not at pulsed high voltage and water cooling of these parts. Furthermore a surface coating, to mitigate dynamic vacuum activity, has been selected. The results of these studies, except for water cooling, have been implemented on an upgraded LHC injection kicker magnet: this magnet was installed in the LHC during the 2017-18 Year End Technical Stop. This paper presents the upgrades, including some test and measurement results.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMK003  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMK005 Preliminary Results from Validation Measurements of the Longitudinal Power Deposition Model for the LHC Injection Kicker Magnet 2636
 
  • V. Vlachodimitropoulos, M.J. Barnes, A. Chmielinska
    CERN, Geneva, Switzerland
  • A. Chmielinska
    EPFL, Lausanne, Switzerland
 
  During Run 1 of the LHC, one of the injection kicker magnets (MKIs) exhibited an excessively high ferrite temperature, caused by coupling of the high intensity beam to the real impedance of the magnet. Beam-screen upgrades, implemented during Long Shutdown 1 (LS1), have been very effective in reducing beam coupling impedance and since then the MKIs have not limited LHC's availability. However, temperature measurements during operation have shown that one end of the MKI's ferrite yoke is consistently hotter than the other. Detailed simulation models and data post-processing algorithms have been developed to understand and mitigate the observed behaviour. In the present paper, the model used to obtain the power loss distribution along the magnet is presented. The model is subsequently applied to two MKI design configurations under study: (i) the one currently in operation and (ii) an upgraded magnet that was installed in the LHC tunnel during the Year End Technical Stop (YETS) 2017/18. In order to validate the expected behaviour a novel measurement technique was developed, applied in both configurations and compared to predictions. The results obtained are reported and conclusions regarding the effectiveness of the design are drawn.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMK005  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPMF013 The Stripline Kicker Prototype for the CLIC Damping Rings at ALBA: Installation, Commissioning and Beam Characterisation 4062
 
  • M. Pont, N. Ayala, M. Carlà, T.F.G. Günzel, U. Iriso, Z. Martí, R. Monge, A. Olmos, F. Pérez, M. Quispe
    ALBA-CELLS Synchrotron, Cerdanyola del Vallès, Spain
  • M.J. Barnes, C. Belver-Aguilar, Y. Papaphilippou
    CERN, Geneva, Switzerland
 
  The extraction system for the CLIC Damping Rings has very tight specifications. Therefore a full characterisation of the behaviour of the stripline kicker under conditions as close as possible to the expected working conditions will be very valuable. To that end the CLIC stripline has been installed in the ALBA Synchrotron Light Source and has been characterised with beam. Prior to its installation, the effect of the stripline kicker on the machine impedance has been assessed. The installation has required the design of an absorber to screen the stripline from synchrotron radiation and additional BPMs have been installed for a better kick angle determination. The commissioning of the stripline with beam has been performed following closely beam parameters, pressure and temperature. The studies with beam include the determination of the longitudinal and transverse impedance of the kicker*, the field homogeneity when excited with a dc field and the field ripple when pulsed. This contribution reports on the first experience with the stripline kicker for the CLIC DR in the ALBA storage ring and presents the results of the initial beam characterisation.
* M. Carla et al., "Beam based impedance measurements of the CLIC stripline at ALBA", Proc. of IPAC'2017.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPMF013  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)