Paper |
Title |
Page |
THPAK019 |
Beam Dynamics of the First Beams for IFMIF-EVEDA RFQ Commissioning |
3246 |
|
- L. Bellan, C. Baltador, M. Comunian, E. Fagotti, F. Grespan, A. Pisent
INFN/LNL, Legnaro (PD), Italy
- T. Akagi
KEK, Ibaraki, Japan
- B. Bolzon, N. Chauvin
CEA/DSM/IRFU, France
- H. Dzitko
F4E, Germany
- K. Kondo, M. Sugimoto
QST, Aomori, Japan
- I. Podadera
CIEMAT, Madrid, Spain
- F. Scantamburlo
IFMIF/EVEDA, Rokkasho, Japan
|
|
|
The installation of the IFMIF-EVEDA RFQ, MEBT, LEBT, source and beam dump was completed in September 2017. The beam dynamics of the first beams for the IFMIF-EVEDA RFQ commissioning is presented. Moreover, a proposal for the CW RFQ steady state commissioning is shown, with a focus on the beam dynamics challenges of the beam transport after the RFQ.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-THPAK019
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPAK021 |
Design of High Resolution Mass Spectrometer for SPES |
3252 |
|
- M. Comunian, C. Baltador, L. Bellan, M. Cavenago, A. Pisent
INFN/LNL, Legnaro (PD), Italy
- E. Khabibullina
ITEP, Moscow, Russia
- E. Khabibullina
MEPhI, Moscow, Russia
|
|
|
Within the framework of the SPES (Selective Production of Exotic Species) project at National Institute of Nuclear Physics (INFN laboratory, Legnaro, Italy) the High Resolution Mass Spectrometer (HRMS) will be build. HRMS needs to provide full separation of the ions with mass resolution 1/20000 for the following breeding and acceleration on ALPI Linac. In this article the main design choice of the HRMS and of the transport channel will be reported.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-THPAK021
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|