Author: An, Y.W.
Paper Title Page
TUPAL001 Solvement of the Asynchronization Between the BPMs and Corrector Power Supplies During Orbit Correction in RCS of CSNS 1008
 
  • M.T. Li
    CSNS, Guangdong Province, People's Republic of China
  • Y.W. An, M.Y. Huang
    IHEP, Beijing, People's Republic of China
 
  This paper proposes a new possible method to re-synchronize the BPM COD data and Corrector Supplies' data during orbit correction in RCS AC-mode beam commis-sioning of CSNS. This method is promising to improve the effect of the obit correction.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAL001  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)