Author: Sekoranja, M.
Paper Title Page
MOPHA092 Prototyping the Resource Manager and Central Control System for the Cherenkov Telescope Array 426
 
  • D. Melkumyan, I. Sadeh, T. Schmidt, P.A. Wegner
    DESY Zeuthen, Zeuthen, Germany
  • M. Fuessling, I. Oya
    CTA, Heidelberg, Germany
  • S. Sah, M. Sekoranja
    Cosylab, Ljubljana, Slovenia
  • U. Schwanke
    Humboldt University Berlin, Institut für Physik, Berlin, Germany
  • J. Schwarz
    INAF-Osservatorio Astronomico di Brera, Merate, Italy
 
  The Cherenkov Telescope Array (CTA) will be the next generation ground-based observatory for gamma-ray astronomy at very-high energies. CTA will consist of two large arrays with 118 Cherenkov telescopes in total, deployed in Paranal (Chile) and Roque de Los Muchachos Observatories (Canary Islands, Spain). The Array Control and Data Acquisition (ACADA) system provides the means to execute observations and to handle the acquisition of scientific data in CTA. The Resource Manager & Central Control (RM&CC) sub-system is a core element in the ACADA system. It implements the execution of observation requests received from the scheduler sub-system and provides infrastructure services concerning the administration of various resources to all ACADA sub-systems. The RM&CC is also responsible of the dynamic allocation and management of concurrent operations of up to nine telescope sub-arrays, which are logical groupings of individual CTA telescopes performing coordinated scientific operations. This contribution presents a summary of the main RM&CC design features, and of the future plans for prototyping.  
poster icon Poster MOPHA092 [1.595 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2019-MOPHA092  
About • paper received ※ 18 September 2019       paper accepted ※ 09 October 2019       issue date ※ 30 August 2020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)