Author: Flath, D.L.
Paper Title Page
FRAPP04
LCLS-II Science-Instruments Control System, Status and Plans  
 
  • D.L. Flath
    SLAC, Menlo Park, California, USA
 
  Funding: This work was performed in support of the LCLS project at SLAC supported by the U.S. Department of Energy, Office of Science, Office of Basic Energy Sciences, under Contract No. DE-AC02-76SF00515.
The LCLS-II will begin operation superconducting linac operations in early 2021. The new photon diagnostics suite of instruments will begin commissioning and early operation using the Cu-linac and upgraded undulators in early 2020. This presentation will discuss upgrades and improvements to the LCLS Control System and related infrastructure which will enable enhanced capabilities including automated beam delivery, laser timing, and 1 MHz repetition-rate data collection and exchange with the Data Acquisition System using EPICS V7.
 
slides icon Slides FRAPP04 [34.211 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)