Author: Farrish, L.E.
Paper Title Page
WEPHA002 LCLS-II Cryomodule and Cryogenic Distribution Control 1071
 
  • D.T. Robinson, A.L. Benwell, C. Bianchini, D. Fairley, S.L. Hoobler, K.J. Mattison, J. Nelson, A. Ratti
    SLAC, Menlo Park, California, USA
  • L.E. Farrish, J. Gubeli, C. Hovater, K. Jordan, W. Moore
    JLab, Newport News, Virginia, USA
  • J.A. Kaluzny, A. Martinez
    Fermilab, Batavia, Illinois, USA
 
  The new superconducting Linear Coherent Light Source (LCLS-II) at the SLAC National Accelerator Laboratory will be an upgrade to LCLS, the world’s first hard X-ray free-electron laser. LCLS-II is in an advanced stage of construction with equipment for both Cryoplants as well as more than half of the 37 cryomodules onsite. Jefferson Lab (JLab) is a partner lab responsible for building half of the LCLS-II cryomodules. Hence the Low Energy Recirculation Facility (LERF) at JLab was used to stage and test LCLS-II cryomodules before shipping them to SLAC. LERF was set up to test two cryomodules at a time. LERF used LCLS-II cryogenic controls instrumentation racks, Programmable Logic Controllers (PLC) controls and Experimental Physics and Industrial Control System (EPICS) Input/Output Controllers (IOCs) with the intention to use the LERF setup to check-out and verify cryogenic controls for LCLS-II. The cryogenic controls first utilized at LERF would then be replicated for controlling all 37 cryomodules via an EPICS user interface. This paper discusses the cryogenic controls currently developed for implementation in the LCLS-II project.  
poster icon Poster WEPHA002 [1.119 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2019-WEPHA002  
About • paper received ※ 28 September 2019       paper accepted ※ 08 October 2019       issue date ※ 30 August 2020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)