Paper | Title | Page |
---|---|---|
TUDPP02 | Data Acquisition System for the APS Upgrade | 841 |
|
||
Funding: Argonne National Laboratory’s work was supported by the U.S. Department of Energy, Office of Science, Office of Basic Energy Sciences, under contract DE-AC02-06CH11357 APS Upgrade multi-bend achromat accelerator (MBA) uses state-of-the-art embedded controllers coupled to various technical subsystems. These controllers have the capability to collect large amounts of fast data for statistics, diagnostics, or fault recording. At times, continuous real-time acquisition of this data is preferred, which presents a number of challenges that must be considered early on in the design; such as network architecture, data management and storage, real-time processing, and impact on normal operations. The design goal is selectable acquisition of turn-by-turn BPM data, together with additional fast diagnostics data. In this paper we discuss engineering specifications and the design of the MBA Data Acquisition System (DAQ). This system will interface with several technical subsystems to provide time-correlated and synchronously sampled data acquisition for commissioning, troubleshooting, performance monitoring and fault detection. Since most of these subsystems will be new designs for the MBA, defining the functionality and interfaces to the DAQ early in the development will ensure the necessary components are included in a consistent and systematic way. |
||
![]() |
Slides TUDPP02 [13.915 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2019-TUDPP02 | |
About • | paper received ※ 30 September 2019 paper accepted ※ 09 October 2019 issue date ※ 30 August 2020 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEMPL009 | Tracking APS-U Production Components With the Component Database and eTraveler Applications | 1026 |
WEPHA072 | use link to see paper's listing under its alternate paper code | |
|
||
Funding: Argonne National Laboratory’s work was supported by the U.S. Department of Energy, Office of Science, Office of Basic Energy Sciences, under contract DE-AC02-06CH11357 The installation of the APS-U has a short schedule of one year, making it imperative to be well prepared before the installation process begins. The Component Database (CDB) has been designed to help in documenting and tracking all the components for APS-U. Two new major domains, Machine Design domain and Measurement and Analysis Archive (MAARC) domain, have been added to CDB to further its ability in exhaustively documenting components. The Machine Design domain will help define the purpose of all the components in the APS-U design and the MAARC domain allows association of components with collected data. The CDB and a traveler application from FRIB have been integrated to help with documenting various processes performed, such as inspections and maintenance. Working groups have been formed to define appropriate work flow processes for receiving components, using the tools to document receiving inspection and QA requirements. The applications are under constant development to perform as expected by the working groups. Over some time, especially after production procurement began, the CDB has seen more and more usage in order to aid in preparation for the APS-U installation. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2019-WEMPL009 | |
About • | paper received ※ 30 September 2019 paper accepted ※ 09 October 2019 issue date ※ 30 August 2020 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |