Author: Boychenko, S.
Paper Title Page
WEPHA139 Scaling Up the Deployment and Operation of an ELK Technology Stack 1431
 
  • S. Boychenko, P. Martel, B. Schofield
    CERN, Geneva, Switzerland
 
  Since its integration into the CERN industrial controls environment, the SCADA Statistics project has become a valuable asset for controls engineers and hardware experts in their daily monitoring and maintenance tasks. The adoption of the tool outside of the Industrial Controls and Safety Systems group scope is currently being evaluated by ALICE, since they have similar requirements for alarms and value changes monitoring in their experiment. The increasing interest in scaling up the SCADA Statistics project with new customers has motivated the review of the infrastructure deployment, configuration management and service maintenance policies. In this paper we present the modifications we have integrated in order to improve its configuration flexibility, maintainability and reliability. With this improved solution we believe we can propose our solution to a wider scope of customers.  
poster icon Poster WEPHA139 [0.342 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2019-WEPHA139  
About • paper received ※ 27 September 2019       paper accepted ※ 09 October 2019       issue date ※ 30 August 2020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)