Author: Arnaudon, L.
Paper Title Page
MOPHA019 Upgrade of the Control System for the LHC High Level RF 236
 
  • Y. Brischetto, L. Arnaudon, V. Costa, D.C. Glenat, D. Landré
    CERN, Geneva, Switzerland
 
  The acceleration of particles in CERN’s Large Hadron Collider (LHC) is carried out by sixteen superconducting radiofrequency (RF) cavities. Their remote control is taken care of by a complex system which involves heterogeneous equipment and interfaces with a number of different subsystems, such as high voltage power converters, cryogenics, vacuum and access control interlocks. In view of the renovations of the CERN control system planned for the Long Shutdown 2 (LS2), the control software for the RF system recently underwent a complete bottom-up refactoring, in order to dispose of obsolete software and ensure the operation of the system in the long term. The upgraded software has been deployed one year before LS2, and allowed successful operation of the machine. This paper describes the strategy followed in order to commission the system and to guarantee LHC nominal operation after LS2.  
poster icon Poster MOPHA019 [1.661 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2019-MOPHA019  
About • paper received ※ 26 September 2019       paper accepted ※ 08 October 2019       issue date ※ 30 August 2020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPHA103 The PLC Control System for the RF Upgrade of the Super Proton Synchrotron 458
 
  • J.C. Oliveira, L. Arnaudon, A. Diaz Fontalva
    CERN, Geneva, Switzerland
 
  During the CERN Long Shutdown 2 (LS2), the 200 MHz main acceleration system of the Super Proton Synchrotron (SPS) is being upgraded. Two cavities will be added to reach a total of six. Each new cavity will be powered by Solid State Power Amplifiers (SSPA) grouped into 16 "towers" of 80 modules each, in total 2560 modules. This paper describes the newly developed control system which uses a master PLC for control and interlock of each cavity and the slave PLC controllers for each of the solid state amplifier towers. The system topology and design choices are discussed. Control and interlocking of all subsystems necessary for the operation of an RF cavity are detailed, and the interaction between the master and slave PLC controllers is outlined. We discuss some preliminary results and performance of the test installation.  
poster icon Poster MOPHA103 [3.012 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2019-MOPHA103  
About • paper received ※ 27 September 2019       paper accepted ※ 02 October 2020       issue date ※ 30 August 2020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)