MOAPP02 |
The SPIRAL2 Control System Status Just Before the First Beam |
8 |
|
- C.H. Haquin, P. Anger, P.-E. Bernaudin, C. Berthe, F. Bucaille, P. Dolegieviez, C.H. Patard, D. Touchard, A.H. Trudel, Q. Tura
GANIL, Caen, France
|
|
|
The SPIRAL2 Facility at GANIL is based on the construction of a superconducting LINAC (up to 5 mA - 40 MeV deuteron beams and up to 1 mA - 14.5 MeV/u heavy ion beams) with two experimental areas called S3 and NFS [1, 2]. At the end of this year, we will reach an important milestone with the first beam accelerated by the superconducting LINAC. The control system of the new facility relies on EPICS and PLC technologies. This paper will focus on the latest validated systems: machine protection system, the LINAC cryogenic system and the radio frequency system of the superconducting cavities. The validation requested a huge effort from all the teams but allow the project to be ready for this important moment.
|
|
|
Slides MOAPP02 [6.262 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-ICALEPCS2019-MOAPP02
|
|
About • |
paper received ※ 23 September 2019 paper accepted ※ 08 October 2019 issue date ※ 30 August 2020 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|