JACoW logo

Joint Accelerator Conferences Website

The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.


BiBTeX citation export for MOAPP03: Control System Plans for SNS Upgrade Projects

@InProceedings{hartman:icalepcs2019-moapp03,
  author       = {S.M. Hartman and K.S. White},
  title        = {{Control System Plans for SNS Upgrade Projects}},
  booktitle    = {Proc. ICALEPCS'19},
  pages        = {12--14},
  paper        = {MOAPP03},
  language     = {english},
  keywords     = {controls, target, EPICS, neutron, experiment},
  venue        = {New York, NY, USA},
  series       = {International Conference on Accelerator and Large Experimental Physics Control Systems},
  number       = {17},
  publisher    = {JACoW Publishing, Geneva, Switzerland},
  month        = {08},
  year         = {2020},
  issn         = {2226-0358},
  isbn         = {978-3-95450-209-7},
  doi          = {10.18429/JACoW-ICALEPCS2019-MOAPP03},
  url          = {https://jacow.org/icalepcs2019/papers/moapp03.pdf},
  note         = {https://doi.org/10.18429/JACoW-ICALEPCS2019-MOAPP03},
  abstract     = {The Spallation Neutron Source at Oak Ridge National Laboratory is planning two major upgrades to the facility. The Proton Power Upgrade project, currently underway, will double the machine power from 1.4 to 2.8 MW by adding seven additional cryomodules and associated equipment. The Second Target Station project, currently in conceptual design, will construct a new target station effectively doubling the potential scientific output of the facility. This paper discusses the control system upgrades required to integrate these projects into the existing EPICS based control systems used for the machine and neutron instrument beamlines. While much of the control system can be replicated from existing solutions, some systems require new hardware and software. Operating two target stations simultaneously will require a new run permit system to safely manage beam delivery.},
}