Beam Instrumentation System for Shanghai Soft X-ray FEL Test Facility
17
L.W. Lai, F.Z. Chen, J. Chen, J. Chen, W. Fang, C. Feng, B. Gao, R. Jiang, Y.B. Leng, Y.B. Yan, L.Y. Yu, R.X. Yuan, N. Zhang, W.M. Zhou, T. Shen
SSRF, Shanghai, People’s Republic of China
S.S. Cao, L.F. Hua
SINAP, Shanghai, People’s Republic of China
Shanghai Soft X-ray FEL (SXFEL) test facility was designed and built to demonstrate EEHG and HGHG schemes and verify key technologies for the future hard X-ray FEL facility (SHINE). After three years commissioning 8.8 nm FEL radiation with peak power of 1 MW had been achieved at the end of 2019. The design, fabrication, commissioning and operation of BI system including Stripline-BPM, Cavity-BPM, screen monitor, bunch length monitor, beam arrival monitor, bunch energy monitor, will be introduced in this paper. Several lessons learned during design stage and beam commissioning stage will be addressed as well.
Right click on video for Picture-in-Picture mode or Full screen display.
Upgrade and First Commissioning of Transverse Feedback System for SSRF
136
N. Zhang, B. Gao, L.W. Lai, R.X. Yuan
SSRF, Shanghai, People’s Republic of China
To be a part of the transverse feedback system upgrade plan in SSRF PHASE II project, a set of Dimtel feedback processors was installed to replace the previous set. In the commissioning, the ability of supressing the trans-verse oscillation was tested and evaluated, also, beam diagnostics and control tools of the processors was used for injection transients analysis, tune tracking and bunch cleaning. The results of the commissioning and data analysis will be presented in this paper.