Author: Yang, T.
Paper Title Page
MOAO03 Commissioning of the Beam Instrumentation System of CSNS 7
 
  • J.L. Sun, W.L. Huang, F. Li, P. Li, R.Y. Qiu, Zh.H. Xu, T. Yang
    IHEP CSNS, Guangdong Province, People’s Republic of China
  • M. Meng, J.M. Tian, T.G. Xu, L. Zeng
    IHEP, Beijing, People’s Republic of China
 
  China Spallation Neutron Source (CSNS) accelerator complex consists of a front end, an 80 MeV DTL LINAC, and a 1.6 GeV Rapid Cycling Synchrotron (RCS). It is designed with a beam power of 100 kW in the first phase and reserves upgrade capability to 500 kW in the second phase. CSNS has started user operation at 20 kW after the initial beam commissioning in 2018, the beam power is quickly up to 50 kW and 80 kW by two times beam commissioning in between the user beam time 2019, and finally reached 100kW, the design goal, in February 2020. This talk gives the experiences and most recent status of beam instrumentation system of CSNS during the beam power ramping, as well as future upgrade plan for CSNS-II.  
video icon
        Right click on video for
Picture-in-Picture mode
or Full screen display.

At start the sound is muted!
 
slides icon Slides MOAO03 [16.381 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IBIC2020-MOAO03  
About • paper received ※ 09 September 2020       paper accepted ※ 28 October 2020       issue date ※ 30 October 2020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)