Author: Cao, S.S.
Paper Title Page
WEPP13 Design and Test of CBPM Prototypes for SHINE 124
 
  • S.S. Cao
    Private Address, Zhangjiang, Shanghai, People’s Republic of China
  • R. Jiang, Y.B. Leng, R.X. Yuan
    SSRF, Shanghai, People’s Republic of China
 
  SHINE (Shanghai High repetition rate XFEL aNd Extreme light facility) is designed to be an extremely high-performance hard X-ray free-electron laser facility located at Zhangjiang, Shanghai. As one of the key parameters of the facility, the resolution of the beam position measurement in the undulator section is required to be under 200 nm at a low bunch charge of 100 pC and better than 10 um at 10 pC. To achieve this, a pre-study based on cavity beam position monitors is under development. Four sets of cavity monitors with different frequencies or load quality factors have been designed and are now manufactured by four different companies. It aims to select the cavity with the best performance and select the most capable company. This paper will briefly introduce the motivation, cavity design considerations, and cold test results.  
poster icon Poster WEPP13 [1.100 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IBIC2020-WEPP13  
About • paper received ※ 02 September 2020       paper accepted ※ 17 September 2020       issue date ※ 30 October 2020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOAO05 Beam Instrumentation System for Shanghai Soft X-ray FEL Test Facility 17
 
  • L.W. Lai, F.Z. Chen, J. Chen, J. Chen, W. Fang, C. Feng, B. Gao, R. Jiang, Y.B. Leng, Y.B. Yan, L.Y. Yu, R.X. Yuan, N. Zhang, W.M. Zhou, T. Shen
    SSRF, Shanghai, People’s Republic of China
  • S.S. Cao, L.F. Hua
    SINAP, Shanghai, People’s Republic of China
 
  Shanghai Soft X-ray FEL (SXFEL) test facility was designed and built to demonstrate EEHG and HGHG schemes and verify key technologies for the future hard X-ray FEL facility (SHINE). After three years commissioning 8.8 nm FEL radiation with peak power of 1 MW had been achieved at the end of 2019. The design, fabrication, commissioning and operation of BI system including Stripline-BPM, Cavity-BPM, screen monitor, bunch length monitor, beam arrival monitor, bunch energy monitor, will be introduced in this paper. Several lessons learned during design stage and beam commissioning stage will be addressed as well.  
video icon
        Right click on video for
Picture-in-Picture mode
or Full screen display.

At start the sound is muted!
 
slides icon Slides MOAO05 [6.930 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IBIC2020-MOAO05  
About • paper received ※ 01 September 2020       paper accepted ※ 17 September 2020       issue date ※ 30 October 2020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)