Paper | Title | Page |
---|---|---|
MOBO02 | Beam Instrumentation at the Fermilab IOTA Ring | 22 |
|
||
Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics. The Integrable Optics Test Accelerator (IOTA) is a storage ring at the end of the Fermilab Accelerator Science and Technology (FAST) facility. The complex is intended to support accelerator R&D for the next generation of particle accelerators. The IOTA ring is currently operating with 150 MeV electrons injected from the FAST Linac and will also receive 2.5 MeV protons from the IOTA Proon Injector currently be installed. The current instrumentation and results along from the first electron commissioning run will be presented along with future plans. |
||
Slides MOBO02 [47.588 MB] | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IBIC2019-MOBO02 | |
About • | paper received ※ 09 September 2019 paper accepted ※ 10 September 2019 issue date ※ 10 November 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPP044 | Beam Position Monitoring System for Fermilab’s Muon Campus | 648 |
|
||
A Beam Position Monitor (BPM) system has been designed for Fermilab Muon Campus. The BPM system measures Turn-by-Turn orbits as well as Closed Orbits (average of multiple turns). While in the early commissioning phase of this program, preliminary measurements have been made using these BPMs. This paper discusses the design and implementation of these BPMs. | ||
Poster WEPP044 [0.612 MB] | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IBIC2019-WEPP044 | |
About • | paper received ※ 09 September 2019 paper accepted ※ 12 September 2019 issue date ※ 10 November 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |