Paper |
Title |
Page |
TUAO04 |
Commissioning of the ARIEL E-LINAC Beam Loss Monitor System |
238 |
|
- M. Alcorta, A.D. D’Angelo, D. Dale, H. Hui, B. Humphries, S.R. Koscielniak, K. Langton, A. Lennarz, R.B. Nussbaumer, T. Planche, M. Rowe, S.D. Rädel
TRIUMF, Vancouver, Canada
|
|
|
The commissioning of the Advanced Rare Isotope & Electron Linac (ARIEL) facility at TRIUMF is underway. The 30 MeV e-linac has successfully been commissioned to 100 W, and to further increase the power to 1 kW the beam loss monitor system (BLM) for fast Machine Protection must be fully operational. There are currently two types of BLMs employed in the e-linac; long-ionization chambers (LIC) and scintillators, consisting of a small BGO coupled to a PMT. A front-end beam loss monitor board was designed at TRIUMF to meet the strict requirements of the BLMs: a trip of the beam occurs on 100 nC in 100 ms of integrated beam loss, and the trip must occur in < 10 us. This contribution will report on the status of the 1 kW BLM system commissioning and will give an outlook as the power is increased to the full 300 kW.
|
|
|
Slides TUAO04 [14.621 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IBIC2019-TUAO04
|
|
About • |
paper received ※ 04 September 2019 paper accepted ※ 07 September 2019 issue date ※ 10 November 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|