Paper | Title | Page |
---|---|---|
MOPP034 | Beam Instrumentation Challenges for the Fermilab PIP-II Accelerator | 181 |
|
||
Funding: This work was supported by the U.S. Department of Energy under contract No. DE-AC02-07CH11359. Fermilab is undertaking the development of a new 800 MeV superconducting RF linac to replace it’s present normal conducting 400 MeV linac. The PIP-II linac warm front-end consists of an ion source, LEBT, RFQ and MEBT which includes an arbitrary pattern bunch chopper, to generate a 2.1 MeV, 2mA H− beam. This is followed immediately by a series of superconducting RF cryomodules to produce a 800 MeV beam. Commissioning, operate and safety present challenges to the beam instrumentation. This paper describes these beam instrumentation challenges and the choices made for PIP-II. |
||
Poster MOPP034 [0.999 MB] | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IBIC2019-MOPP034 | |
About • | paper received ※ 10 September 2019 paper accepted ※ 11 September 2019 issue date ※ 10 November 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |