TUAO04 Commissioning of the ARIEL E-LINAC Beam Loss Monitor System 238
 
  • M. Alcorta, A.D. D’Angelo, D. Dale, H. Hui, B. Humphries, S.R. Koscielniak, K. Langton, A. Lennarz, R.B. Nussbaumer, T. Planche, M. Rowe, S.D. Rädel
    TRIUMF, Vancouver, Canada
 
  The commissioning of the Advanced Rare Isotope & Electron Linac (ARIEL) facility at TRIUMF is underway. The 30 MeV e-linac has successfully been commissioned to 100 W, and to further increase the power to 1 kW the beam loss monitor system (BLM) for fast Machine Protection must be fully operational. There are currently two types of BLMs employed in the e-linac; long-ionization chambers (LIC) and scintillators, consisting of a small BGO coupled to a PMT. A front-end beam loss monitor board was designed at TRIUMF to meet the strict requirements of the BLMs: a trip of the beam occurs on 100 nC in 100 ms of integrated beam loss, and the trip must occur in < 10 us. This contribution will report on the status of the 1 kW BLM system commissioning and will give an outlook as the power is increased to the full 300 kW.  
slides icon Slides TUAO04 [14.621 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IBIC2019-TUAO04  
About • paper received ※ 04 September 2019       paper accepted ※ 07 September 2019       issue date ※ 10 November 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)