The Beam Diagnostics in the CSNS Commissioning | |
|
||
In June, 2017, the whole accelerator components were finished the installation work in the tunnel. Followed the installation, several different machine mode commissioning were carried out. The beam diagnostics were tested and used. The beam diagnostics performance and lessons were introduced in the paper. | ||
![]() |