Author: Liu, X.J.
Paper Title Page
MOPB05 Commissioning Progress of LEAF at IMP 42
 
  • Y. Yang, W.P. Dou, X. Fang, Y.H. Guo, H. Jia, P. Jiang, L. Jing, X.J. Liu, L. Lu, W. Lu, W. Ma, L.T. Sun, L.P. Sun, Y. Wei, Y.H. Zhai, H.W. Zhao
    IMP/CAS, Lanzhou, People’s Republic of China
 
  A Low Energy intense-highly-charged ion Accelerator Facility (LEAF), which is mainly consist of an 45 GHz superconducting ECR ion source, LEBT and an 81.25 MHz 4-vane RFQ, was designed to produce and accelerate heavy ions, from helium to uranium with A/Q between 2 and 7, to the energy of 0.5 MeV/u. The typical beam intensity is designed up to 2 emA CW for the uranium beam. The project was launched in 2015 and has been successfully commissioned with He+ (A/Q=4), N2+ (A/Q=7) beam and accelerated the beams in the CW regime to the designed energy of 0.5 MeV/u. Beam commissioning results of He+ beam have been reported previously. This paper presents the details of N2+ commissioning and beam studies.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-HIAT2018-MOPB05  
About • paper received ※ 15 October 2018       paper accepted ※ 23 October 2018       issue date ※ 05 November 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)