Paper |
Title |
Page |
WEPB15 |
Beam Commissioning in the First Chinese Demo Cancer Therapy Synchrotron |
161 |
|
- J. Shi, W.P. Chai, J.W. Xia, J.C. Yang
IMP/CAS, Lanzhou, People’s Republic of China
|
|
|
Heavy Ion Medical Machine in Wuwei (HIMM-ww) is the first Chinese heavy ion accelerator facility de-veloped for cancer therapy. After commissioning, the particle number after acceleration reached 1.5·109 ppp (particles per pulse), while injection exceeded 3·109 ppp. The slow extraction efficiency reached nearly 90% for all energies from 120 to 400 MeV/u. The spill duty factor exceeded 90% at a sample rate of 10 kHz. This paper reports the results of the synchrotron commis-sioning.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-HIAT2018-WEPB15
|
|
About • |
paper received ※ 16 October 2018 paper accepted ※ 23 October 2018 issue date ※ 05 November 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|