|
A Decade of Operational Experience with the 500 MHz RF System at SRRC and the Next Era of Superconducting RF
|
|
769
|
|
Ch.E. Wang, L.H. Chang, S.S. Chang, E.S. Chen, F.-Z. Hsiao, W.-K. Lau, M.-C. Lin, G.-H. Luo, T.-T. Yang, M.-S. Yeh, SRRC, Hsinchu
|
|
|
|
PAPER
|
|
|
|
|
|
|
|
Analysis of the Superconducting RF Cavity under Heavy Beam Loading at Taiwan Light Source
|
|
1529
|
|
W.-K. Lau, L.H. Chang, Ch.E. Wang, M.-S. Yeh, SRRC, Hsinchu
|
|
|
|
PAPER
|
|
|
|
|
|
|
|
Design of a Broadband Kicker Cavity for the TLS Longitudinal Feedback System
|
|
2088
|
|
W.-K. Lau, T.-T. Yang, M.-S. Yeh, SRRC, Hsinchu
|
|
|
|
PAPER
|
|
|
|
|
|
|
|
Testing Results of Major Components and Progress Report of TLS Superconducting Cavity Project
|
|
2262
|
|
G.-H. Luo, L.H. Chang, S.S. Chang, C.T. Chen, F.-Z. Hsiao, C.-C. Kuo, M.-C. Lin, Ch.E. Wang, T.-T. Yang, M.-S. Yeh, SRRC, Hsinchu; M. Pekeler, ACCEL, Bergisch Gladbach
|
|
|
|
PAPER
|
|
|
|
|
|
|
|
Electronic System for Superconducting RF Module at the Synchrotron Radiation Research Center
|
|
2295
|
|
M.-S. Yeh, L.H. Chang, K.-T. Hsu, M.-C. Lin, G.-H. Luo, Ch.E. Wang, SRRC, Hsinchu
|
|
|
|
PAPER
|
|
|
|
|
|
|