|
Beam Loss Monitoring and Control
|
|
109
|
|
K. Wittenburg, DESY, Hamburg
|
|
|
|
PAPER
- SLIDES
|
|
|
|
|
|
|
|
Problems of Installation of Vibrating Wire Scanners into Accelerator Vacuum Chamber
|
|
1837
|
|
S. Arutunian, A. Avetisyan, N. Dobrovolski, M. Mayilyan, I. Vasiniuk, YerPhI, Yerevan; K. Wittenburg, DESY, Hamburg; R. Reetz, HTM Reetz GmbH, Berlin
|
|
|
|
PAPER
|
|
|
|
|
|
|
|
R&D Towards a Laser Based Beam Size Monitor for the Future Linear Collider
|
|
1912
|
|
T. Kamps, G.A. Blair, F. Poirier, RHUL, Egham; H. Lewin, S. Schreiber, N. Walker, K. Wittenburg, DESY, Hamburg
|
|
|
|
PAPER
|
|
|
|
|
|
|
|
Cryogenic Current Comparator for Absolute Measurements of the Dark Current of Superconducting Cavities for TESLA
|
|
1915
|
|
K. Knaack, M. Wendt, K. Wittenburg, DESY, Hamburg; R. Neubert, W. Vodel, FSU, Jena; A. Peters, GSI, Darmstadt
|
|
|
|
PAPER
|
|
|
|
|
|
|
|
Expansion of the Fast Linac Protection System for High Duty Cycle Operation at the TESLA Test Facility
|
|
1966
|
|
H. Schlarb, D. Pugachov, M. Staack, K. Wittenburg, DESY, Hamburg; Y. Cernousko, A. Ivanov, I. Krouptchenkov, S. Makonin, IHEP, Protvino, Moscow Region; V. Gorbunov, V. Greschko, INR, Moscow
|
|
|
|
PAPER
|
|
|
|
|
|
|