|
Accelerator Challenges of Proposed Radioactive Beam Facilities
|
|
99
|
|
O. Boine-Frankenheim, GSI, Darmstadt
|
|
|
|
PAPER
|
|
|
|
|
|
|
|
Conceptual Design of a Facility for Internal Target Experiments with Antiprotons up to 15 GeV/c
|
|
575
|
|
B. Franzke, K. Beckert, P. Beller, O. Boine-Frankenheim, A. Dolinskii, F. Nolden, M. Steck, GSI, Darmstadt
|
|
|
|
PAPER
|
|
|
|
|
|
|
|
Double Synchrotron Complex SIS100/200 for a New Research Facility at GSI
|
|
626
|
|
P. Spiller, K. Blasche, O. Boine-Frankenheim, B. Franczak, P. Hülsmann, G. Moritz, H. Reich-Sprenger, P. Schütt, GSI, Darmstadt
|
|
|
|
PAPER
|
|
|
|
|
|
|
|
Driving the Electron-Cloud Instability by an Electron Cooler
|
|
1559
|
|
G. Rumolo, F. Zimmermann, CERN, Geneva; O. Boine-Frankenheim, I. Hofmann, GSI, Darmstadt
|
|
|
|
PAPER
|
|
|
|
|
|
|
|
Measurement and Calculation of U28+ Beam Lifetime in SIS
|
|
2547
|
|
O. Boine-Frankenheim, A. Krämer, E. Mustafin, H. Reich-Sprenger, P. Spiller, GSI, Darmstadt
|
|
|
|
PAPER
|
|
|
|
|
|
|