|
Background Simulation for the CLIC Beam Delivery System with Geant
|
|
449
|
|
G.A. Blair, RHUL, Egham; H. Burkhardt, CERN, Geneva; H.-J. Schreiber, DESY, Zeuthen
|
|
|
|
PAPER
|
|
|
|
|
|
|
|
Comparison of Different Tracking Codes for Beam Delivery Systems of Linear Colliders
|
|
488
|
|
S. Redaelli, R.W. Assmann, H. Burkhardt, D. Schulte, F. Zimmermann, CERN, Geneva; N. Walker, DESY, Hamburg; G.A. Blair, RHUL, Egham; Y. Nosochkov, T.O. Raubenheimer, A. Seryi, P. Tenenbaum, SLAC, Stanford
|
|
|
|
PAPER
|
|
|
|
|
|
|
|
CLIC Simulations from the Start of the Linac to the Interaction Point
|
|
500
|
|
D. Schulte, R.W. Assmann, T.E. D'Amico, G. Guignard, N. Leros, S. Redaelli, T. Risselada, F. Zimmermann, CERN, Geneva; G.A. Blair, RHUL, Egham
|
|
|
|
PAPER
|
|
|
|
|
|
|
|
Design Status of the CLIC Beam Delivery System
|
|
530
|
|
F. Zimmermann, M. Aleksa, R.W. Assmann, H. Burkhardt, S. Redaelli, T. Risselada, S. Russenschuck, D. Schulte, CERN, Geneva; A. Faus-Golfe, IFIC, Valencia; G.A. Blair, RHUL, Egham
|
|
|
|
PAPER
|
|
|
|
|
|
|
|
R&D Towards a Laser Based Beam Size Monitor for the Future Linear Collider
|
|
1912
|
|
T. Kamps, G.A. Blair, F. Poirier, RHUL, Egham; H. Lewin, S. Schreiber, N. Walker, K. Wittenburg, DESY, Hamburg
|
|
|
|
PAPER
|
|
|
|
|
|
|