Author: Wen, L.P.
Paper Title Page
MOP006 The Design and Simulation on the Extraction System for CYCIAE-50 35
 
  • S. An, F.P. Guan, P. Huang, L.Y. Ji, M. Li, Y.L. Lv, S.M. Wei, L.P. Wen, H.D. Xie, J.S. Xing, T.J. Zhang, X. Zheng
    CIAE, Beijing, People’s Republic of China
 
  A 50 MeV H compact cyclotron (CYCIAE-50) as a proton irradiation facility is under construction at China Institute of Atomic Energy. The proton beam with the energy of 30 MeV to 50 MeV and the current of 10 uA will be extracted by a single stripping extraction system. In order to reduce the beam loss, the combination magnet is fixed inside the magnetism yoke. The positions of stripping points for the different extraction energy are calculated and the extracted beam trajectories after stripping foil are simulated in detail in this paper. The extracted beam distribution after stripping foil and the extracted beam characters will be studied in this paper. The beam parameters after extraction will be given by the extracting orbit simulation. The design on the whole stripping extraction system has been finished and will be presented in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-Cyclotrons2019-MOP006  
About • paper received ※ 15 September 2019       paper accepted ※ 25 September 2019       issue date ※ 20 June 2020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOP008 Mechanical Design of Beam Lines for a 230 MeV SC Cyclotron at CIAE 42
 
  • M. Yin, S. An, F.P. Guan, Y.L. Lv, G.F. Pan, F. Wang, F. Wang, S.M. Wei, L.P. Wen, T.J. Zhang, F.Zhu. Zhu
    CIAE, Beijing, People’s Republic of China
 
  Funding: This work was supported in part by the National Natural Science Foundation of China under Grant 11475269 and 11375274.
To develop the proton beam transfer system which used in the field of proton therapy, the mechanical design of proton beam lines based on the CYCIAE-230 has been finished at the China Institute of Atomic Energy (CIAE). The proton beam transfer system includes the beam lines, beam dump, gantry, nozzle, couch, image guidance system, etc. Two beam lines are designed at CIAE this moment. One is for the nozzle system, the other is for the beam dump. The beam lines include four systems: the energy selection system, the beam transportation systems, gantry system, beam dump. The beam lines are very compact in order to match the beam optics and the space limitation. The gantry can be rotated ±180°. There are several key components in beam lines, such as magnets, degrader, beam diagnostics component, vacuum component, etc. The designed mechanical tolerance of the magnets is limited less than 0.1 mm. There are at least four targets on each magnets for collimation and all the components can be adjusted in three dimensions. The magnets are being manufactured now. The mechanical design of proton beam lines based on the CYCIAE-230 will be presented in this paper.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-Cyclotrons2019-MOP008  
About • paper received ※ 15 September 2019       paper accepted ※ 26 September 2019       issue date ※ 20 June 2020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUP005 Three Years Operation of CYCIAE-100 156
 
  • T. Ge, L.C. Cao, Z.H. Fu, S.G. Hou, B. Ji, H. Jiang, S.Q. Li, Y.Q. Li, Z.W. Liu, Y.L. Lv, G.F. Pan, L. Wang, L.P. Wen, Z.G. Yin, T.J. Zhang
    CIAE, Beijing, People’s Republic of China
 
  The 100 MeV high intensity proton cyclotron (CYCIAE-100) developed by China Institute of Atomic Energy is a multi-purpose variable energy AVF cyclotron. Its design specifications are: energy from 75 to 100 MeV continuously adjustable, beam intensity 200uA, beam current can be extracted in both directions. CYCIAE-100 was commissioned to extract 100 MeV proton beam for the first time in July 2014. The first physics experiment was carried out in November 2016. By June 2019, the design specifications of CYCIAE-100 was commissioned and the maximum beam power was 52 kW. The beam intensity range from 1 pA to 520 µA is achieved, and the beam stability is about 1% for 8 hours. Several typical physics experiments have been carried out. Such as: The physics experiment of CYCIAE-100 driving ISOL device to generate radioactive nuclear beam, SiC and SRAM proton irradiation experiments, calibration experiment of high-energy proton electron total dose detector probe, etc. At present, the beam time for CYCIAE-100 is about 5,000 hours, providing effective beam time for more than 3,000 hours for many users at home and abroad, and the other beam time for beam development.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-Cyclotrons2019-TUP005  
About • paper received ※ 15 September 2019       paper accepted ※ 26 September 2019       issue date ※ 20 June 2020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)