Author: Matlocha, T.
Paper Title Page
MOP022 Project of a Novel Multi-Orbital Beam Bunching and Extraction from the U-120M Cyclotron 80
 
  • M. Čihák, R. Běhal, P. Krist, T. Matlocha, J. Stursa, V. Zach
    NPI, Řež near Prague, Czech Republic
 
  We introduce the bunching system for a time structure control of the U-120M cyclotron beam. The system is based on a unique pulsed vertical deflection of the selected final orbits of the internal accelerated beam of the H ions to an extractor-stripper (a thin carbon foil positioned below the cyclotron median plane). A set of home-made programs have been developed for simulations and parameters determination of the system. Results of some simulations (i.e. dimensions of the deflection system, parameters of the pulsed high voltage power supply, position of the stripper, beam trajectories, beam parameters, beam losses, Be target position etc.) are presented. The system will be used for fast neutron generation and consequently for spectrometric measurement of neutron energy by the time of flight (ToF) method. The system will provide beam bunch interval up to 1000 ns range of a defined beam time structure (up to beam bunch period to beam bunch width ratio min 100).  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-Cyclotrons2019-MOP022  
About • paper received ※ 15 September 2019       paper accepted ※ 25 September 2019       issue date ※ 20 June 2020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUP014 Deflecting System Upgrade Initial Simulations for 37 MeV Cyclotron at NPI Řež 185
 
  • T. Matlocha
    NPI, Řež near Prague, Czech Republic
 
  NPI Řež U-120M multi-particle variable energy cyclotron system for positive ions extraction consists of three electrostatic deflectors, one active magnetic channel and an electromagnetic bump exciter. The deflectors transmission ratio for deuterons, alpha particles and Helium 3 ions is rather low, usually about 10%, for protons it is far below 5%. Based on an experience from other cyclotron laboratories, the general concept of the extraction system has been modified and the last two electrostatic deflectors were replaced with two magnetic channels. In the early stage of the upgrade, simulations were performed for protons at 28 MeV and Helium 3 ions at 44 MeV with and without the magnetic bump exciter. The extraction efficiency and beam losses along the extraction path are evaluated. The presented modified extraction system simulations suggest promising results. The total transmission ratio of the deflecting system has increased significantly, allowing work to continue and expect a positive final result.  
poster icon Poster TUP014 [1.241 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-Cyclotrons2019-TUP014  
About • paper received ※ 15 September 2019       paper accepted ※ 26 September 2019       issue date ※ 20 June 2020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)