Author: Caruso, A.C.
Paper Title Page
MOP001 Design and Commissioning of RF System for SC200 Cyclotron 21
 
  • G. Chen, C. Chao, Y. Chen, K.Z. Ding, G. Liu, X.Y. Long, Z. Peng, Y. Song, C. Yu, X. Zhang, Y. Zhao
    ASIPP, Hefei, People’s Republic of China
  • L. Calabretta, A.C. Caruso
    INFN/LNS, Catania, Italy
  • O. Karamyshev
    JINR/DLNP, Dubna, Moscow region, Russia
  • G.A. Karamysheva, G. Shirkov
    JINR, Dubna, Moscow Region, Russia
 
  The SC200 proton therapy superconducting cyclotron is currently under construction by ASIPP (Hefei, China) and JINR (Dubna, Russia). The radio frequency (RF) system which provides an accelerating electric field for the particles, has been designed and tested in a high-power commissioning. The RF system consists of RF cavity, Low-level RF control system, RF source, transmission network and so on. The main performances of RF cavity meet design and use requirements in the cold test. The RF cavity achieved with an unload Q factor of 5200 at the resonant frequency of 91.5 MHz, 60 kV (Center)~120 kV (Extraction) accelerating voltage and coupling state of S11 <-30 dB. The low-level RF (LLRF) system has been tested with an amplitude stability of <0.2% and a phase stability of <0.1 degree in the high-power commissioning. What is more, the cavity operated in a ~50 kW continuous wave state after 4 weeks RF conditioning. Some risks have exposed at higher power test, but related solutions and improvements have been developed. In future work, the target of RF system is effective operation under the overall assembly of cyclotron after further optimization and RF conditioning.  
poster icon Poster MOP001 [0.720 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-Cyclotrons2019-MOP001  
About • paper received ※ 09 September 2019       paper accepted ※ 24 September 2019       issue date ※ 20 June 2020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOP013 Mechanical Modifications of the Median Plane for the Superconducting Cyclotron Upgrade 51
 
  • G. Gallo, L. Allegra, L. Calabretta, A.C. Caruso, G. Costa, E. Messina, M.S. Musumeci, D. Rifuggiato, E. Zappalà
    INFN/LNS, Catania, Italy
 
  The Superconducting Cyclotron (CS) is a three sectors, compact accelerator with a wide operating diagram, capable of accelerating heavy ions with q/A from 0.1 to 0.5 up to energies from 2 to 100 MeV/u. Recently a significant upgrade has been proposed to increase the light ion beam intensity by means of extraction by stripping. For the implementation of the new extraction mode, many relevant modifications are needed in the median plane. The biggest upgrade action is the replacement of the present superconducting magnet with a new one, compatible with the beam trajectory and envelope in the extraction by stripping. The extraction by stripping mode implies the installation of two stripper systems, one in a hill and the other in a valley, that allow to extract all the ions requested by the users. Finally, since the present electrostatic extraction mode will be maintained, several relevant mechanical issues have to be faced when switching from one extraction mode to the other one, the location of one electrostatic deflector being the same as the stripper system. The focus of this paper will be the presentation of the different mechanical features involved in the upgrade.  
poster icon Poster MOP013 [1.583 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-Cyclotrons2019-MOP013  
About • paper received ※ 12 September 2019       paper accepted ※ 24 September 2019       issue date ※ 20 June 2020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEA02 The Developments of the RF System Related to the K-800 Superconducting Cyclotron Upgrade 262
 
  • A.C. Caruso, L. Calabretta, G. Costa, G. Gallo, A. Longhitano, D. Rifuggiato, A. Spartà, G. Torrisi, E. Zappalà
    INFN/LNS, Catania, Italy
 
  The K-800 superconducting cyclotron has been in operation at Laboratori Nazionali del Sud for almost 25 years. It has been subjected to continuous upgrades and modifications since 1994: the RF couplers have been redesigned, the new dees have been changed from aluminium to copper, as has the new central region from radial to axial injection of the beam, the hybrid configuration solid state - tube of the power amplifiers, the digital LLRF, etc. The next scheduled important upgrade of the Cyclotron mainly consists in a new extraction beam line able to support the increase of the beam current intensity. The accelerated beam will be extracted in two ways: by stripper and by electrostatic deflector and, consequently, one of the most important features of the new upgrade is the new cryostat. Further upgrades and refurbishments of the other main parts of the cyclotron, such as a new liner, the modification of the RF cavities and dees, the refurbishment of HLRF-LLRF, the insertion of the stripper extraction system, to name but a few, are in progress, too. This work focuses on the RF system upgrade.  
slides icon Slides WEA02 [10.816 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-Cyclotrons2019-WEA02  
About • paper received ※ 15 September 2019       paper accepted ※ 25 September 2019       issue date ※ 20 June 2020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
FRB03 3D Radio Frequency Simulation of the INFN-LNS Superconducting Cyclotron 361
 
  • G. Torrisi, L. Allegra, L. Calabretta, A.C. Caruso, G. Costa, G. Gallo, A. Longhitano, L. Neri, D. Rifuggiato
    INFN/LNS, Catania, Italy
 
  An upgrade plan of the Superconducting Cyclotron operating at INFN-LNS is ongoing. In this paper, a 3D numerical model of the Cyclotron radio frequency cavity is presented. Simulations include the coaxial sliding shorts, liner vacuum chamber, coupler, trimming capacitor and the Dees structures. CST microwave studio software has been used for numerical computation. RF simulations are mandatory also in order to analyze the field in the beam region and evaluate the impact of different Dees geometry and eventual field asymmetries. Moreover, 3D COMSOL Multiphysics simulations have been carried out in order to couple the electromagnetic field solution to a custom beam-dynamics code developed in Matlab as a future plan. Time evolution of accelerated beam and electromagnetic field make also possible to verify the magnetic field synchronization. Experimental validation of the developed model will be also presented.  
slides icon Slides FRB03 [19.931 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-Cyclotrons2019-FRB03  
About • paper received ※ 15 September 2019       paper accepted ※ 25 September 2019       issue date ※ 20 June 2020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)