Paper | Title | Page |
---|---|---|
THPPP085 | End to End Beam Dynamics of the ESS Linac | 3933 |
|
||
The European Spallation Source, ESS, uses a linear accelerator to deliver a high intensity proton beam to the target station. The nominal beam power on target will be 5~MW at an energy of 2.5~GeV. We briefly describe the individual accelerating structures and transport lines through which we have carried out multiparticle beam dynamics simulations. We will present a review of the beam dynamics from the source to the target. | ||
THPPC014 | Commissioning Status of the 3 MeV RFQ for the Compact Pulsed Hadron Source (CPHS) at Tsinghua University | 3305 |
|
||
Funding: Work supported by the “985 Project” of the Ministry of Education of China. We present, in this paper, the commissioning status of a Radio Frequency Quadrupole (RFQ) accelerator for the Compact Pulsed Hadron Source (CPHS) at Tsinghua University. In 2012 the 3-meter-long RFQ will deliver 3 MeV protons to the downstream High Energy Beam Transport (HEBT) with the peak current of 50 mA, pulse length of 0.5 ms and beam duty factor of 2.5%. Braze of the vanes was completed in September, 2011. The final field tuning of the whole cavity was completed in October, 2011. Initial commissioning will be underway at the beginning of 2012. |
||