MOPPP056 | Injection Transient Motion at PLS-II | 688 |
|
||
PLS-II is an upgraded third generation synchrotron which includes many insertion devices with improved beam properties. Top-up operation is short time-interval injection to make roughly constant current and is essential to provide high intensity beam. When the electrons are injected to synchrotron, the stored beam is disturbed by small error of the injection system and the beam quality at the beamline can be decreased. We present this injection transient motion at PLS-II. | ||
TUOBB02 | Commissioning of the PLS-II | 1089 |
|
||
The Pohang Light Source (PLS) has operated for 14 years successfully. To meet the request of the increasing user community, the PLS-II that is the upgrade project of PLS has been completed. Main goals of the PLS-II are to increase beam energy to 3 GeV, to increase number of insertion devices by the factor of two (20 IDs), to increase beam current to 400 mA and to reduce beam emittance below 10 nm with existing PLS tunnel and injection system. The PLS-II had been commissioned over the six months. During commissioning, we achieved 14 insertion devices operation and top-up operation with 100 mA beam current and 5.8 nm beam emittance. In this presentation, we report the experimental results from the PLS-II commissioning. | ||
![]() |
Slides TUOBB02 [3.484 MB] | |
TUPPP060 | Injector Design for PAL-XFEL Project | 1732 |
|
||
Funding: The Ministry of Education, Science and Technology of the Korean Government The PAL-XFEL project has the baseline specification of FEL radiation down to 0.1 nm with a 10 GeV S-band normal conducting linac. To fulfill the requirement of the beam parameter, the S-band photoinjector was designed. Numerical optimizations for nominal and low charge operations are presented. |
||
WEPPD069 | PLS-II Linac Upgrade | 2681 |
|
||
This paper reports on the recent status of the Pohang Light Source (PLS)-II linac at Pohang Accelerator Laboratory (PAL). From 2009, the linac upgrade has been started increasing its energy from 2.5 GeV to 3 GeV aiming stable top-up mode operation. First, we show that the stability status of the two different types of modulators to meet the top-up condition which requires very stable modulator system in linac. Next, we introduce upgrade status those differ from their PLS (2.5 GeV) such as installation of the dual vacuum systems for the electron gun to replace it immediately, adding important diagnostic tools, and reutilization of the beam analysis system just after pre-injector. Finally we present the electron beam parameters measured by those diagnostic system. | ||
THPPC059 | Design of SLED System with Dual Side-wall Coupling Irises and Biplanar Power Splitter for PAL XFEL | 3425 |
|
||
The SLED system of the PAL XFEL is required to be operated with the RF input power of 80 MW and the pulse width of 4 us. The high RF dose from the RF breakdown at the coupling holes and power splitter prohibits that the original design of the SLED serve this operation condition. To reduce the gradient at the cavity coupling structure, the concept of dual side-wall coupling irises is introduced. In addition, the 3dB splitter is modified with the concept of biplanar coupler structure. | ||