Paper |
Title |
Page |
WEPPD039 |
Status of the Utility System Construction for the 3 GeV TPS Storage Ring |
2597 |
|
- J.-C. Chang, W.S. Chan, J.-R. Chen, Y.F. Chiu, Y.-C. Chung, K.C. Kuo, Y.-C. Lin, C.Y. Liu, I. Liu, Z.-D. Tsai, T.-S. Ueng
NSRRC, Hsinchu, Taiwan
|
|
|
The construction of the utility system for the 3.0 GeV Taiwan Photon Source (TPS) was started in the end of 2009. The utility building for the TPS ring will be completed in the end of 2011. The whole construction of the utility system is scheduled to be completed in the end of 2012. Total budget of this construction is about four million dollars. This utility system presented in this paper includes the electrical power, cooling water, air conditioning, compressed air and fire control systems.
|
|
|
WEPPD041 |
The Strategy between High Precision Temperature Control and Energy Saving for Air-Conditioning System |
2603 |
|
- Z.-D. Tsai, W.S. Chan, J.-C. Chang, C.S. Chen, Y.-C. Chung, C.W. Hsu, C.Y. Liu
NSRRC, Hsinchu, Taiwan
|
|
|
In the Taiwan Light Source (TLS), several studies related to the temperature stability for air conditioning system continued to be in progress. Using new control philosophy can minimize temperature variations effectively. A high precision temperature control within ±0.05°C for air condition system has been conducted to meet the more critical stability requirement. Due to the importance of energy saving issue, the power consumption of air conditioning system was also upgraded and intended to reduce extensively. The paper addresses some experience between high precision temperature control and energy saving about operation of air conditioning system. The significant improvements proven that both targets can achieve simultaneously.
|
|
|